SAWS: Business Center - Contract Solicitations
Aquifer Beaker

Edwards Aquifer

Aquifer Level 671.0'
9/19/18 - Official

The Edwards aquifer and its catchment area in the San Antonio region is about 8,000 square miles and includes all or part of 13 counties in south-central Texas.

Learn More »


image

Stage 2:
Water On Your Day

Watering with an irrigation system or sprinkler is allowed only once a week from 7-11 a.m. and 7-11 p.m. on your designated watering day as determined by your address.

Learn More »


Close

Aquifer Level 671.0 | Stage 2: Water On Your Day

Log In

Pay Your Bill Online

Already registered? Log in now.

Forgot your password?

New User

My Account Page

No user account? No problem.

Sign Up Now


Close
Contract Solicitations
Bid Opening Results

The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.

Results 121 - 140 of 419 « 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 »
Solicitation No. Type Job No. Close Date Project Name Details
B-16-021-GC IFB 13-0118 10/10/16 I.H. 10 Ground Storage Tank Painting and Rehabilitation Project View Results PDF
CO-00068-RA IFB 09-2502 10/7/16 W-31 IH-10 Boerne Stage to Old Fredericksburg Rd. View Results PDF
CO-00080-GC IFB 16-6507 9/29/16 SAWS Dos Rios Sludge Blend Facilities Expansion Project View Results PDF
CD-B-16-017-SM IFB 16-0117 & 16-1403 9/28/16 2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 4 Project View Results PDF
CD-B-16-016-SM IFB 16-0116 & 16-1403 9/28/16 2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 3 Project View Results PDF
CO-00070-SM IFB 14-4508 9/8/16 San Antonio River Outfall Pipeline Project No. 2A View Results PDF
B-16-014-GC IFB 13-0118 9/8/16 I.H. 10 Ground Storage Tank Painting and Rehabilitation Project View Results PDF
CD-B-16-013-SM IFB 16-0118 & 16-1403 8/10/16 2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 5 Project View Results PDF
CO-00060-GC IFB 13-2506 8/9/16 C-12 Donaldson Terrace Project View Results PDF
CO-00078-RA IFB 15-6104 8/4/16 Replace Stevens Ranch PS Ground Storage Tank View Results PDF
CO-00082-RA IFB 16-7002 7/27/16 Camp Bullis Road 12-inch Water Main Project View Results PDF
CO-00069-SM IFB 14-1178 7/19/16 Highland Estates 24 in. Oversize Approach Water Main (12 in. Required) View Results PDF
CO-00081-JG IFB 16-1055 7/15/16 East Evans 24" Approach and Border Main View Results PDF
CD-B-16-012-SM IFB 16-0117 & 16-1403 7/1/16 the 2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 4 View Results PDF
CD-B-16-011-SM IFB 16-0116 & 16-1403 7/1/16 2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 3 View Results PDF
CD-B-16-010-SM IFB 16-0115 & 16-1403 6/30/16 2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 2 View Results PDF
CO-00056-MF IFB 15-4510 &15-4512 6/10/16 C-13 Broadway Corridor - Package 1.C and 3.C View Results PDF
CO-00064-JG IFB 16-4305 6/3/16 2016 Water Construction Contract View Results PDF
CO-00065-SM IFB 09-2507 6/2/16 Lift Station Elimination Phase II - LS #73 Project View Results PDF
CO-00057-SM IFB 14-4305 5/25/16 DSP US Highway 281 Water Main Replacement Project View Results PDF
Results 121 - 140 of 419 « 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 »