SAWS: Business Center - Contract Solicitations
Aquifer Beaker

Edwards Aquifer

Aquifer Level 680.7'
4/23/19 - Official

The Edwards aquifer and its catchment area in the San Antonio region is about 8,000 square miles and includes all or part of 13 counties in south-central Texas.

Learn More »


image

Year-Round Watering Hours

Watering with an irrigation system or sprinkler is allowed any day of the week before 11 a.m. or after 7 p.m.

Learn More »


Close

Aquifer Level 680.7 | Year-Round Watering Hours

Log In

Pay Your Bill Online

Already registered? Log in now.

Forgot your password?

New User

My Account Page

No user account? No problem.

Sign Up Now


Close
Contract Solicitations
Bid Opening Results

The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.

Results 181 - 200 of 474 « 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 »
Solicitation No. Type Job No. Close Date Project Name Details
CO-00070-SM IFB 14-4508 9/8/16 San Antonio River Outfall Pipeline Project No. 2A View Results PDF
B-16-014-GC IFB 13-0118 9/8/16 I.H. 10 Ground Storage Tank Painting and Rehabilitation Project View Results PDF
CD-B-16-013-SM IFB 16-0118 & 16-1403 8/10/16 2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 5 Project View Results PDF
CO-00060-GC IFB 13-2506 8/9/16 C-12 Donaldson Terrace Project View Results PDF
CO-00078-RA IFB 15-6104 8/4/16 Replace Stevens Ranch PS Ground Storage Tank View Results PDF
CO-00082-RA IFB 16-7002 7/27/16 Camp Bullis Road 12-inch Water Main Project View Results PDF
CO-00069-SM IFB 14-1178 7/19/16 Highland Estates 24 in. Oversize Approach Water Main (12 in. Required) View Results PDF
CO-00081-JG IFB 16-1055 7/15/16 East Evans 24" Approach and Border Main View Results PDF
CD-B-16-012-SM IFB 16-0117 & 16-1403 7/1/16 the 2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 4 View Results PDF
CD-B-16-011-SM IFB 16-0116 & 16-1403 7/1/16 2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 3 View Results PDF
CD-B-16-010-SM IFB 16-0115 & 16-1403 6/30/16 2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 2 View Results PDF
CO-00056-MF IFB 15-4510 &15-4512 6/10/16 C-13 Broadway Corridor - Package 1.C and 3.C View Results PDF
CO-00064-JG IFB 16-4305 6/3/16 2016 Water Construction Contract View Results PDF
CO-00065-SM IFB 09-2507 6/2/16 Lift Station Elimination Phase II - LS #73 Project View Results PDF
CO-00057-SM IFB 14-4305 5/25/16 DSP US Highway 281 Water Main Replacement Project View Results PDF
CO-00058-RA IFB 15-4503 5/25/16 C5 Culebra – Castroville to Laredo & C28 Zarzamora Creek – San Gabriel to NW 23rd Street Phase 1B Project View Results PDF
B-16-007-JG IFB 16-0113, 16-1401 5/12/16 2016 Annual Water Distribution Leak Repairs Contract, Package 6 View Results PDF
B-16-006-JG IFB 16-0112, 16-1401 5/12/16 2016 Annual Water Distribution Leak Repairs Contract, Package 5 View Results PDF
CO-00059-GC IFB 15-7202 5/4/16 Meadowood Acres Interconnect at Montgomery Road Project View Results PDF
CO-00055-SM IFB 14-7206 5/3/16 Bitters to Aspen Interconnect – Permanent Solution (WO#13) View Results PDF
Results 181 - 200 of 474 « 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 »