SAWS: Business Center - Contract Solicitations
Aquifer Beaker

Edwards Aquifer

Aquifer Level 681.9'
5/24/19 - Official

The Edwards aquifer and its catchment area in the San Antonio region is about 8,000 square miles and includes all or part of 13 counties in south-central Texas.

Learn More »


image

Year-Round Watering Hours

Watering with an irrigation system or sprinkler is allowed any day of the week before 11 a.m. or after 7 p.m.

Learn More »


Close

Aquifer Level 681.9 | Year-Round Watering Hours

Log In

Pay Your Bill Online

Already registered? Log in now.

Forgot your password?

New User

My Account Page

No user account? No problem.

Sign Up Now


Close
Contract Solicitations
Bid Opening Results

The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.

Results 21 - 40 of 480 « 1 2 3 4 5 6 7 8 9 10 11 12 »
Solicitation No. Type Job No. Close Date Project Name Details
CD-B-18-030-JAM IFB 19-0107 & 19-1402 1/14/19 2019 Annual Sanitary Sewer Main Point Repair, Manhole Adjustments and Laterals Construction Contract, Package 2 View Results PDF
CO-00247-JP IFB 16-6004 1/14/19 MICRON STATION PRODUCTION WELL NO. 4 View Results PDF
CD-B-18-029-JAM IFB 19-0106, 19-1402 1/14/19 2019 Annual Sanitary Sewer Main Point Repair, Manhole Adjustments and Laterals Construction Contract, Package 1 View Results PDF
CO-00208-JP IFB 16-4015 1/9/19 LOUIS PASTEUR 12-INCH WATER MAIN REPLACEMENT View Results PDF
CO-00228-JP IFB 16-4011 1/7/19 N. MEL WAITERS WAY 24-INCH WATER MAIN REPLACEMENT View Results PDF
CD-B-18-028-JAM IFB 19-0102 & 19-1402 12/20/18 2019 Sanitary Sewer Laterals Renewal and Repair Construction Contract, Package 2 View Results PDF
CO-00250-SM IFB 19-0108 12/20/18 E-19 Ira Lee Siphon Project View Results PDF
CD-B-18-027-JAM IFB 19-0101 & 19-1402 12/20/18 2019 Sanitary Sewer Laterals Renewal and Repair Construction Contract, Package 1 View Results PDF
B-18-020-JG IFB 19-0117 12/17/18 2019 Annual Asphalt Overlay Work Order Construction Contract, Package II View Results PDF
B-18-019-JG IFB 19-0116 12/17/18 2019 Annual Asphalt Overlay Work Order Construction Contract, Package I View Results PDF
CO-00220-JP IFB 18-1125 12/11/18 Grosenbacher Road 16-Inch Water Main Extension View Results PDF
B-18-022-JG IFB 19-0111 12/11/18 2019 Annual Concrete Placement Work Order Construction Contract, Package II View Results PDF
CO-00213-JP IFB 17-1123 12/11/18 Blue Skies Offsite Water Main Extension View Results PDF
B-18-021-JG IFB 19-0110 12/11/18 2019 Annual Concrete Placement Work Order Construction Contract, Package I View Results PDF
B-18-026-JG IFB 19-0115 & 19-1401 12/10/18 2019 Annual Water Distribution Leak Repairs Contract, Package IV View Results PDF
B-18-025-JG IFB 19-0114 & 19-1401 12/10/18 2019 Annual Water Distribution Leak Repairs Contract, Package III View Results PDF
B-18-024-JG IFB 19-0113 & 19-1401 12/7/18 2019 Annual Water Distribution Leak Repairs Contract, Package II View Results PDF
B-18-023-JG IFB 19-0112 & 19-1401 12/7/18 2019 Annual Water Distribution Leak Repairs Contract, Package I View Results PDF
CO-00243-SM IFB 18-4009 12/6/18 2018 Water Main Dead End Main Flushing View Results PDF
CO-00231-JG IFB 18-5013 and 18-5513 12/3/18 2020 SMP Package IV (Cadwallader St., Upson St.) View Results PDF
Results 21 - 40 of 480 « 1 2 3 4 5 6 7 8 9 10 11 12 »