SAWS: Business Center - Contract Solicitations
Aquifer Beaker

Edwards Aquifer

Aquifer Level 670.5'
9/18/18 - Official

The Edwards aquifer and its catchment area in the San Antonio region is about 8,000 square miles and includes all or part of 13 counties in south-central Texas.

Learn More »


image

Stage 2:
Water On Your Day

Watering with an irrigation system or sprinkler is allowed only once a week from 7-11 a.m. and 7-11 p.m. on your designated watering day as determined by your address.

Learn More »


Close

Aquifer Level 670.5 | Stage 2: Water On Your Day

Log In

Pay Your Bill Online

Already registered? Log in now.

Forgot your password?

New User

My Account Page

No user account? No problem.

Sign Up Now


Close
Contract Solicitations
Bid Opening Results

The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.

Results 361 - 380 of 419 « 9 10 11 12 13 14 15 16 17 18 19 20 21 »
Solicitation No. Type Job No. Close Date Project Name Details
B-11-010-RA IFB 11-0104 & 11-1401 2/22/11 2011 Annual Water Distribution Leak Repairs Contract – Package 2 View Results PDF
B-11-009-RA IFB 11-0103 & 11-1401 2/22/11 2011 Annual Water Distribution Leak Repairs Contract – Package 1 View Results PDF
B-11-007-RA IFB 10-8625-218 2/22/11 Fence Construction: Nelson, Baker and Pattillo Tracts View Results PDF
B-11-008-MR IFB 07-3004 2/10/11 Borgfeld Road – West, 16-Inch Oversized Water Project View Results PDF
B-11-001-DD IFB 08-6505 1/31/11 Install Digester Gas Flowmeters Dos Rios WRC View Results PDF
B-11-006-RA IFB 11-0101 1/28/11 Annual 2011 Asphalt Overlay Work Order Construction Contract Project View Results PDF
B-10-057-DD IFB 08-6502 12/17/10 Dos Rios Water Recycling Center (WRC) Re-Rating Headworks Improvements and Process Enhancements, Phase I Project View Results PDF
B-10-055-DD IFB 11-2503 12/14/10 Medina River Sewer Outfall - Segment 2 View Results PDF
B-10-060-CM IFB 10-5124 & 10-5624 11/18/10 2011 Water and Sewer Construction Package II View Results PDF
B-10-059-CM IFB 10-5123 & 10-5623 11/18/10 2011 Water and Sewer Construction Package 1 Project View Results PDF
B-10-058-CM IFB 10-1025 11/4/10 Anderson Tract 16-inch Oversize (12-Inch Required) Water Mian Project View Results PDF
B-10-044-CM IFB 10-4001 10/29/10 2010 Open Cut Water Work Order Construction Contract View Results PDF
B-10-048-DD IFB 06-2503 10/28/10 Lift Stations Rehabilitation – Phase 2 Project View Results PDF
B-10-050-DD IFB 07-7003 10/19/10 Water Transmission Main – Rogers Ranch to I.H. 10 Project View Results PDF
B-10-052-MR IFB 07-3008 10/12/10 Borgfeld Road – East, 16-Inch and 24-Inch Oversize (12-Inch Required) Water Main Project View Results PDF
B-10-056-DG IFB 09-6005 10/6/10 Pressure Reducing Valve (PRV) Flow Monitoring and Pressure Monitoring Project View Results PDF
B-10-053-MR IFB 07-6006-113 10/5/10 Cross Mountain Elevated Storage Tank Project View Results PDF
B-10-051-RA IFB 07-1693 9/21/10 Masterson Road 36-Inch Oversize (15-Inch Required) Sanitary Sewer Project View Results PDF
B-10-046-RA IFB 10-2507 9/17/10 Western Watershed Sewer Relief Line - Hwy. 90 to S.W. Loop 410 Project (Upper Segment) Morey Road Siphon Construction View Results PDF
B-10-043-CM IFB 08-4515 9/14/10 Helotes Creek Erosion Repairs View Results PDF
Results 361 - 380 of 419 « 9 10 11 12 13 14 15 16 17 18 19 20 21 »




NEED HELP? CHAT NOW!