SAWS: Business Center - Contract Solicitations
Aquifer Beaker

Edwards Aquifer

Aquifer Level 671.0'
9/19/18 - Official

The Edwards aquifer and its catchment area in the San Antonio region is about 8,000 square miles and includes all or part of 13 counties in south-central Texas.

Learn More »


image

Stage 2:
Water On Your Day

Watering with an irrigation system or sprinkler is allowed only once a week from 7-11 a.m. and 7-11 p.m. on your designated watering day as determined by your address.

Learn More »


Close

Aquifer Level 671.0 | Stage 2: Water On Your Day

Log In

Pay Your Bill Online

Already registered? Log in now.

Forgot your password?

New User

My Account Page

No user account? No problem.

Sign Up Now


Close
Contract Solicitations
Bid Opening Results

The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.

Results 41 - 60 of 419 « 1 2 3 4 5 6 7 8 9 10 11 12 13 »
Solicitation No. Type Job No. Close Date Project Name Details
CO-00156-FF IFB 16-6502 2/12/18 Dos Rios WRC Primary Clarifier Rehabilitation Project View Results PDF
CO-00162-JAM IFB 17-5146 & 17-5627 2/6/18 2018 Pipelines Water and Sewer Construction Contract Pkg V View Results PDF
CO-00161-JAM IFB 17-5140 & 17-5620 2/6/18 2018 Pipelines Water and Sewer Construction Contract Pkg IV View Results PDF
CO-00159-JP IFB 17-5139 & 17-5619 2/5/18 2018 Pipelines Water and Sewer Construction Contract Pkg III View Results PDF
CO-00158-JP IFB 17-5138 & 17-5618 2/5/18 2018 Pipelines Water and Sewer Construction Contract Pkg II View Results PDF
CO-00157-JP IFB 17-5137 & 17-5617 2/5/18 2018 Pipelines Water and Sewer Construction Contract Pkg I View Results PDF
CO-00141-JG IFB 17-4526 2/2/18 Multiple Sewershed Package 3 View Results PDF
B-17-020-JAM IFB 17-0119 1/31/18 Dos Rios Building 16 & 17 Roof Replacement Project View Results PDF
CO-00154 IFB 16-6505 1/19/18 Dos Rios WRC Headworks Enhancement Project View Results PDF
CO-00148-JG IFB 16-4513 12/8/17 Jones Maltsberger at the Quarry View Results PDF
CO-00152-SM IFB 17-1064 12/6/17 Evans Road 24-Inch Water Main Extension Project View Results PDF
CO-00125-SM IFB 16-1659 12/6/17 Mission Del Lago - Offsite Sewer Improvements (15-Inch Required - 27-Inch Oversize) View Results PDF
CD-B-17-017-SM IFB 18-0102 & 18-1403 11/29/17 2018 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 2 Project View Results PDF
CD-B-17-016-SM IFB 18-0101 & 18-1403 11/29/17 2018 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 1 Project View Results PDF
CO-00144-DW IFB 15-6101 11/10/17 Zarzamora Pump Station Improvements Project View Results PDF
CO-00143 IFB 16-1613 11/8/17 Classen-Steubing Oversized Sewer Main Project View Results PDF
CO-00150 IFB 17-1112 11/8/17 Harlach Farms Subdivision 16-Inch and 24-Inch Approach Water Main View Results PDF
B-17-019-SM IFB 17-0117 11/8/17 2017 Annual Concrete Placement Work Order Construction Contract – Package 2 Project View Results PDF
B-17-018-SM IFB 17-0116 11/8/17 2017 Annual Concrete Placement Work Order Construction Contract, Packages 1 Project View Results PDF
CO-00147-JG IFB 16-4520 11/6/17 East Sewershed Large Diameter Package III View Results PDF
Results 41 - 60 of 419 « 1 2 3 4 5 6 7 8 9 10 11 12 13 »