SAWS Procurement Bids - Annual Contract for Cure-In-Place-Pipe (CIPP) Point Repair Installation Equipment and Associated Consumables
Aquifer Beaker

Edwards Aquifer

Aquifer Level 662.9'
11/20/17 - Official

The Edwards aquifer and its catchment area in the San Antonio region is about 8,000 square miles and includes all or part of 13 counties in south-central Texas.

Learn More »


image

Year-Round Watering Hours

Watering with an irrigation system or sprinkler is allowed any day of the week before 11 a.m. or after 7 p.m.

Learn More »


Close

Aquifer Level 662.9 | Year-Round Watering Hours

Login

Pay Your Bill Online

Already Registered? Login Now.

Forgot Your Password?

New User

Register for SAWS eBill

Don't Have An Account? Get Started Now.

Sign Up Now


Close
Procurement Bids
San Antonio Water System
Bid No. 17-1070
Annual Contract for Cure-In-Place-Pipe (CIPP) Point Repair Installation Equipment and Associated Consumables
Due Date: 3:00 PM Thursday, 10/26/17   Status: Selection Pending Board Approval

The San Antonio Water System is soliciting bids to Purchase equipment and consumables to provide for the repair / reconstruction of existing service lateral or sanitary sewer main lines without excavation or bypass pumping. This may be accomplished by the installation of a resin impregnated flexible fiberglass mat that is positioned in the existing service lateral or sewer main at the defect to be repaired. Curing of the resin will be by ambient temperature and be unaffected by submersion in normal wastewater conditions. The fiberglass repair shall be impermeable, continuous, tight-fitting, and corrosion resistant.
Interested Firm List
Click here to view firms who have obtained IFB bid package.
 


NEED HELP? CHAT NOW!