SAWS Procurement Bids: Bid Opening Results
Aquifer Beaker

Edwards Aquifer

Aquifer Level 686.0'
12/14/18 - Official

The Edwards aquifer and its catchment area in the San Antonio region is about 8,000 square miles and includes all or part of 13 counties in south-central Texas.

Learn More »


image

Year-Round Watering Hours

Watering with an irrigation system or sprinkler is allowed any day of the week before 11 a.m. or after 7 p.m.

Learn More »


Close

Aquifer Level 686.0 | Year-Round Watering Hours

Log In

Pay Your Bill Online

Already registered? Log in now.

Forgot your password?

New User

My Account Page

No user account? No problem.

Sign Up Now


Close
Procurement Bids

Bid Opening Results

The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section

Results 41 - 60 of 1069 « 1 2 3 4 5 6 7 8 9 10 11 12 13 »

Bid No. Type Close Date Project Name Details
18-18087 IFB 7/13/18 Early Procurement of Carbon Dioxide Storage and Pressurized Feed System for the Central Water Integration Pipeline Project View Results PDF
18-18090 IFB 7/13/18 Early Procurement of On-Site Sodium Hypochlorite Generation System for the Central Water Integration Pipeline Project View Results PDF
18-18091 IFB 7/13/18 Early Procurement of Horizontal Split-Case Centrifugal Pumps for the Central Water Integration Pipeline Project View Results PDF
18-18079 IFB 7/10/18 Plugging of System Limberg Public Supply Wells View Results PDF
18-18068 IFB 7/10/18 Cleaning and Inspection of Sanitary Sewer Assets at the Former Salado Creek WRC Consent Decree Related View Results PDF
18-18076 IFB 6/27/18 Pre-Purchase of Pressure Filtration System for the Central Water Integration Pipeline Project View Results PDF
18-0028 IFB 6/26/18 Annual Contract for Miscellaneous Waterworks Brass Goods View Results PDF
18-0034 IFB 6/20/18 Annual Contract for Water Meter Strainers View Results PDF
18-1417 IFB 6/20/18 Annual Contract for HDPE DR-9 Pipe (Copper Tubing Size) View Results PDF
18-1034 IFB 6/20/18 Annual Contract for Sewer Cleaning Tools View Results PDF
18-0029 IFB 6/20/18 Annual Contract for Water Meter Boxes and Valve Box Components View Results PDF
18-0284 IFB 6/19/18 Annual Contract for Lamps View Results PDF
18-0017 IFB 6/13/18 Annual Contract for Joint Restraints View Results PDF
18-6034 IFB 6/8/18 Annual Contract for Janitorial Supplies, Air Fresheners & Odor Control View Results PDF
18-6037 IFB 6/8/18 Annual Contract for Brooms, Brushes and Accessories View Results PDF
18-18059 IFB 6/5/18 Purchase of Type One Water System and Warranty View Results PDF
18-18067 IFB 6/1/18 Mitchell Lake Leaper House Exterior Painting View Results PDF
18-18058 IFB 6/1/18 Replace Damaged Tongue and Groove Flooring at Mitchell Lake Leaper House View Results PDF
18-0065 IFB 6/1/18 Annual Contract for Ductile Iron MJ Compact Fitting View Results PDF
18-18069 IFB 6/1/18 Cleaning of Digester Tanks at the Dos Rios Water Recycling Center View Results PDF

Results 41 - 60 of 1069 « 1 2 3 4 5 6 7 8 9 10 11 12 13 »