|
Job No.
|
Closing Date
|
Project Name
|
Details
|
|
09-8616-203 & 09-8617-204
|
11/20/09
|
Oliver Ranch Wells #5 & #9 and BSR #2 Well Rehabilitation Project
|
More...
|
|
02-3514
|
11/18/09
|
Roosevelt Avenue Sewer Main Rehabilitation Project
|
More...
|
|
08-6501
|
11/17/09
|
Dos Rios and Leon Creek Water Recycling Centers Tertiary Filters Project
|
More...
|
|
07-2503
|
11/17/09
|
Twin 72-inch Sewer Replacement Project
|
More...
|
|
03-6505
|
11/16/09
|
Dos Rios WRC Digester Gas Transfer Utilities Project
|
More...
|
|
07-6002-112
|
11/6/09
|
Culebra Pump Station Project
|
More...
|
|
09-2315
|
11/5/09
|
Crown Meadows Lift Station 124 Elimination Project
|
More...
|
|
08-4501
|
11/2/09
|
Wastewater Collection System Small Main Rehabilitation at Focus Areas – Pipebursting Method Method
|
More...
|
|
08-4501
|
11/2/09
|
Wastewater Collection System Small Main Rehabilitation at Focus Areas – Cured in Place Pipe (CIPP) Lining Method
|
More...
|
|
07-7001
|
10/28/09
|
24-Inch Transmission Main from Loop 410 to FM 1937 Phase 2 Project
|
More...
|
|
09-8608-201,09-8609-201, & 09-8610-201
|
10/22/09
|
Pivot Irrigation System Installation at Franklin, Pratt & Watkins(North & South) Farms Project
|
More...
|
|
07-8601-202
|
10/20/09
|
Medio Creek WRC Recycled Water Pump Station and Line Project
|
More...
|
|
06-8625
|
10/19/09
|
Primary and Secondary Well Metering Project
|
More...
|
|
09-4512
|
10/8/09
|
2009 Open Cut Sewer Construction Contract Project
|
More...
|
|
08-6504
|
10/7/09
|
Dos Rios WRC Sludge Thickening and Aeration System Improvements Project
|
More...
|
|
09-6007
|
9/30/09
|
Salado Pump Station Improvement Project
|
More...
|
|
09-2521
|
9/29/09
|
Central Watershed Sewer Relief Line (C-02) Phase II
|
More...
|
|
09-2519
|
9/25/09
|
Central Watershed Sewer Relief Main (C-01)
|
More...
|
|
09-7004
|
9/24/09
|
Whitewood from Medina Base Rd. to S.W. Military Dr. Water Main Project
|
More...
|
|
CAP3109101
|
9/23/09
|
SAWS Headquarters Condensate Recovery Construction Project
|
More...
|
|
09-2520
|
9/23/09
|
Central Watershed Sewer Relief Line (CO-1) Phase I (Rehabilitation)
|
More...
|
|
08-2502
|
9/15/09
|
Lift Station Elimination Phase I
|
More...
|
|
09-0109
|
9/4/09
|
Water Production Sidewalk and Paving Improvements Project
|
More...
|
|
09-5054 & 09-5554
|
9/4/09
|
San Antonio River Improvement Historic Mission Reach, Phase III, Project
|
More...
|
|
08-1144
|
9/3/09
|
Shavano Park Unit 19A, Ph 1, Commercial (12 Inch Required, 20-Inch Oversize) Project
|
More...
|
|
09-2503
|
9/3/09
|
Odor Control Stations Rehabilitation, Phase II Project
|
More...
|
|
09-6006
|
9/1/09
|
2009 Well Plugging and Facility Demolition Project
|
More...
|
|
09-6003
|
8/31/09
|
Sunset Pump Station Improvements Project
|
More...
|
|
09-0104
|
8/10/09
|
S.S.C. Meter Shop Electrical Improvements Project
|
More...
|
|
05-5012 & 05-5512
|
7/28/09
|
Donaldson Terrace Area Phase IIC Project
|
More...
|
|
09-5015
|
7/28/09
|
FM2252 (Nacogdoches): Loop1604 to Evans Road (24-inch Water Main Adjustment Project.
|
More...
|
|
09-5516
|
7/27/09
|
San Antonio River Improvement Historic Mission Reach, Phase IIC Project
|
More...
|
|
07-3005
|
7/23/09
|
Front Gate at Fair Oaks Ranch Approach Main 24-inch Oversize (12-inch Required) Project
|
More...
|
|
09-0113 & 09-1401
|
7/22/09
|
2009 Annual Water Distribution Leak Repair, Package 2
|
More...
|
|
07-6001
|
7/13/09
|
Watson Elevated Storage Tank Project
|
More...
|
|
09-0111 and 09-1401
|
7/10/09
|
2009 Annual Water Distribution Leak Repair Project
|
More...
|
|
07-7001
|
6/30/09
|
24-Inch Transmission Main from Loop 410 to FM 1937 Phase 2 Project
|
More...
|
|
93-4509
|
6/30/09
|
Old Salado Creek Siphon Replacement Project
|
More...
|
|
09-6504
|
6/15/09
|
DOS RIOS WRC BOILER & SOFTENER REPLACEMENT PROJECT ( B-09-013-MR)
|
More...
|
|
09-0108 (O&M) and 09-1402 (CIP)
|
6/11/09
|
2009 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Contract
|
More...
|
|
09-0107
|
6/9/09
|
Annual 2009 Asphalt Overlay Work Order Construction Contract
|
More...
|
|
09-4511
|
6/5/09
|
Annual 2009 Pipe Bursting Work Order Construction Contract Project
|
More...
|
|
09-4510
|
6/5/09
|
Annual 2009 Cured-In-Place Pipe Work Order Construction Contract Project
|
More...
|
|
09-8606-207
|
6/4/09
|
Local Carrizo Program Offsite Well Collection Project
|
More...
|
|
09-5034 & 09-5534
|
6/4/09
|
SAWS Water & Sewer Construction Contract Package IV
|
More...
|
|
09-5033 & 09-5533
|
6/2/09
|
SAWS Water & Sewer Construction Contract Package III, Project
|
More...
|
|
08-6003
|
5/21/09
|
Water Production Facility Upgrades Phase II – Bitters and Sutton Pump Stations Project
|
More...
|
|
08-2505
|
5/7/09
|
Lift Stations SCADA Project
|
More...
|
|
08-4501
|
5/6/09
|
Find-It/Fix-It Wastewater Main Cleaning and Inspection in the GS-02 Sub-Basin
|
More...
|
|
93-4509
|
5/5/09
|
Old Salado Creek Siphon Replacement Project
|
More...
|
|
08-7501
|
5/5/09
|
Hemisfair Park Condensate Return Line Replacement Project
|
More...
|
|
05-4002
|
4/29/09
|
Brooks City-Base Water Improvement Project
|
More...
|
|
09-0105
|
4/7/09
|
2009 Excavation and Backfill Work Order Construction Contract
|
More...
|
|
09-5024 & 09-5524
|
4/2/09
|
Leigh St: Presa to Labor Water & Sewer Main Replacement Project
|
More...
|
|
96-5611 & 08-5584
|
4/2/09
|
Terrell Hills Water & Sewer Main Replacement Project, Phase 1
|
More...
|
|
09-5032 & 09-5532
|
4/1/09
|
SAWS Water & Sewer Construction Contract, Package II Project
|
More...
|
|
09-5031 & 09-5531
|
3/31/09
|
SAWS Water & Sewer Construction Contract, Package I Project
|
More...
|
|
05-8615-206
|
3/25/09
|
Twin Oaks Water Treatment Plant 12-Inch Plug Valve Replacement Project
|
More...
|
|
06-4003
|
2/10/09
|
Kelly USA Pressure Zone 4 Water Infrastructure Improvements
|
More...
|
|
07-3006
|
2/9/09
|
The Winwood Phase 2, 24-inch Oversize Approach Main (12-inch Required) Project
|
More...
|
|
08-5083
|
1/14/09
|
Bradford: Camino Santa Maria to Tulane
|
More...
|
|
08-7501
|
12/3/08
|
The Hemisfair Park Condensate Return Line Replacement Project.
|
More...
|
|
08-3003
|
11/18/08
|
The Windwood 24-inch Water Oversize Approach Main (12-inch Required)
|
More...
|
|
06-6003
|
11/17/08
|
General McMullen Elevated Storage Tank Project
|
More...
|
|
04-4004 & 04-4515
|
11/12/08
|
Lackland Terrace Water and Sanitary Sewer Main Improvements Phase I Project
|
More...
|
|
08-7016-113
|
11/11/08
|
Indian Hills Pump Station Pressure Zone 12
|
More...
|
|
07-3011
|
11/7/08
|
The Windwood 24-inch Water Oversize Approach Main, Phase I, (12-inch Required) Project
|
More...
|
|
08-7706 & 08-7704
|
10/21/08
|
Rilling Road Spoils Yard Project
|
More...
|
|
07-7002
|
10/20/08
|
Prue Rd. to Bamberger 30” Water Transmission Main Project
|
More...
|
|
08-6005
|
10/17/08
|
Culebra Pump Station No. 4 Well Project
|
More...
|
|
07-6004
|
10/17/08
|
Babcock Elevated Storage Tank
|
More...
|
|
07-5549.
|
10/15/08
|
U.S. Hwy 281:Mud Creek to Stone Oak Pkwy (Lift Station Removal No. 158)
|
More...
|
|
08-0101 & 08-0114
|
10/14/08
|
2008 Water Production Facility Painting & Rehabilitation Project - Package II
|
More...
|
|
07-0004
|
10/13/08
|
US 281 S. at Medina River 12-Inch Water Main Replacement Project
|
More...
|
|
07-6005
|
10/10/08
|
Wayland Floating Ground Storage Tank Project
|
More...
|
|
08-3002
|
10/9/08
|
Lazy M Ranch Subdivision Project
|
More...
|
|
07-2505
|
10/8/08
|
Odor Control Stations Project Ferrous Sulfate Injection Stations
|
More...
|
|
06-6502
|
10/8/08
|
Leon Creek Water Recycling Center Improvements Phase 2
|
More...
|
|
07-5016 & 07-5516
|
10/2/08
|
Mahncke Park Area Streets: New Braunfels (Eleanor to Pershing) Project
|
More...
|
|
08-8601-202 & 08-8602-202
|
9/12/08
|
Recycled Water Improvements
|
More...
|
|
05-2502
|
9/9/08
|
the Central Watershed Sewer Relief Line (C-02)
|
More...
|
|
08-0102
|
8/19/08
|
3.0 MG Water Standpipe at the Indian Springs Facility Project
|
More...
|
|
06-8603-207
|
8/15/08
|
Local Carrizo Program Offsite Drilling and Testing Project
|
More...
|
|
07-3012
|
8/11/08
|
Cielo Vista 30-Inch & 24-Inch Oversize Approach Water Mains Project
|
More...
|
|
07-3014
|
8/11/08
|
Cielo Vista 24-Inch Oversized (12-Inch Required) On-Site Water Main Project
|
More...
|
|
08-0110
|
7/30/08
|
Excavation and Backfill Work Order Construction Contract
|
More...
|
|
07-3015
|
7/22/08
|
the Sanctuary Oversize Approach and Border 24-Inch Water Main Project
|
More...
|
|
99-4508
|
7/21/08
|
Eastern Watershed Sewer Relief Line (E-03) Project
|
More...
|
|
07-7000-112
|
7/16/08
|
Anderson-Micron 48” Water Main – Segment III Project
|
More...
|
|
07-1153
|
7/8/08
|
Tesoro Ridge Subdivision Project
|
More...
|
|
08-4511
|
7/7/08
|
Annual 2008 Pipebursting Work Order Construction Contract Project
|
More...
|
|
08-0106
|
6/20/08
|
Small Sized (0 to 15 SY) Concrete Placement Work Order Construction Contract
|
More...
|
|
08-0108
|
6/20/08
|
Large Sized (> 15 SY) Concrete Placement Work Order Construction Contract
|
More...
|
|
07-6508
|
6/10/08
|
Dos Rios Water Recycling Center (WRC) Flow Equalization Basin (FEB) Diversion Project
|
More...
|
|
07-5059 & 07-5559
|
6/10/08
|
Haven For Hope
|
More...
|
|
07-7000
|
6/5/08
|
Anderson-Micron 48" Water Main - Segment III
|
More...
|
|
08-4507
|
5/23/08
|
Annual 2008 Cured-In-Place Pipe Work Order Construction Contract
|
More...
|
|
07-6008
|
5/20/08
|
University Pump Station (P.S.) High Service Pump #2 Addition Project
|
More...
|
|
07-8605 & 08-8603
|
5/14/08
|
Wiseman Boulevard and Northwest Vista College Recycled Water Main Extension Project
|
More...
|
|
07-5032
|
5/6/08
|
IH 35: IH 410 @ Binz Engleman to 0.2 miles North Of Rittiman Road Project
|
More...
|
|
08-6506
|
4/24/08
|
Dos Rios Water Recycling Center New Lab Irrigation Project
|
More...
|
|
06-6007
|
4/10/08
|
Market Street Pump Station Improvements Project,
|
More...
|
|
08-8606-202
|
4/1/08
|
Dos Rios Recycled Water Pump Station Pedestal Improvements Project
|
More...
|
|
07-5055
|
3/11/08
|
Ivy Lane - Amesbury to Clement Circle
|
More...
|
|
06-6503
|
1/17/08
|
Water Recycling Centers Disinfection System Evaluation and Performance Upgrade Project
|
More...
|
|
08-8605-201
|
1/16/08
|
Mallard Farm Pivot Irrigation System Project
|
More...
|
|
08-8606-201
|
1/16/08
|
Lindenborn Farm Pivot Irrigation System Project
|
More...
|
|
08-8607-201
|
1/16/08
|
Conrad Farm Pivot Irrigation System
|
More...
|
|
08-8609-201
|
1/16/08
|
Walton Farm Pivot Irrigation System Project
|
More...
|
|
07-6011 & 07-0123
|
11/16/07
|
Well Plugging/Facility Demolition Project
|
More...
|
|
07-7500
|
11/15/07
|
No. 2 Chilled Water Plant Chiller Addition Project
|
More...
|
|
99-4002 & 99-4505
|
11/13/07
|
Los Angeles Heights Water Main and Sanitary Sewer Replacement Phase I Project
|
More...
|
|
02-4003 & 02-4505
|
11/8/07
|
Lakeside Village Water & Sewer Improvements Project
|
More...
|
|
99-4515
|
11/8/07
|
Salado Sanitary Sewer Outfall Siphons, Siphon Nos. 8, 9, and 10 Project
|
More...
|
|
07-4500
|
11/6/07
|
Annual 2007 Cured-In-Place Pipe Work Order Construction Contract
|
More...
|
|
05-4001 & 05-4501
|
10/30/07
|
San Fernando Water and Sewer Main Replacement – Phase III
|
More...
|
|
06-6503
|
10/25/07
|
Water Recycling Centers Disinfection System Evaluation and Performance Upgrade Project
|
More...
|
|
02-4503
|
10/22/07
|
Lift Stations Rehabilitation - Phase 1 Project
|
More...
|
|
07-5019
|
10/18/07
|
US 87 @ SALADO CREEK Project,
|
More...
|
|
07-5505
|
10/17/07
|
U.S. Hwy 281: Mud Creek to Stone Oak Parkway Lift Station Removal
|
More...
|
|
06-6005
|
10/17/07
|
Broadview Tank Project
|
More...
|
|
04-5026
|
10/16/07
|
Loop 1604 @ SH 151 Project
|
More...
|
|
94-4502
|
10/3/07
|
South Area Lift Stations Elimination Project
|
More...
|
|
04-5039 & 04-5539
|
9/18/07
|
San Antonio River Improvement Historic Mission Reach, Phase I
|
More...
|
|
06-7001
|
9/14/07
|
Talley Road: FM 471 to Ray Lieck Project
|
More...
|
|
07-0100 and 07-6010
|
9/13/07
|
Lost Lane Standpipe, University Hills Pump Station, Hunter’s Chase Lift Station, and No. 152 Lift Station
|
More...
|
|
07-0124
|
9/11/07
|
Edwards Aquifer monitor well for the Saline Water Study
|
More...
|
|
07-5012 & 07-5512
|
9/11/07
|
US 90 @ OLD HWY 90 Project
|
More...
|
|
07-1515
|
9/7/07
|
Alamo Ranch/Medio Creek South Sanitary Sewer Outfall Project
|
More...
|
|
07-1070
|
9/5/07
|
Presidio Heights, Phase I 20” Oversized (12” Required) On-Site Water Main Project
|
More...
|
|
07-1068 & 07-3003
|
9/5/07
|
Bloomfield Hills 30" Oversize Border & 30" Oversize Approach Water Main
|
More...
|
|
04-5039 & 04-5539
|
8/23/07
|
San Antonio River Improvement Historic Mission Reach, Phase I Project,
|
More...
|
|
06_8603_207
|
8/16/07
|
Local Carrizo Program, Onsite Well Collection Project
|
More...
|
|
07-0116
|
8/14/07
|
Rehabilitation of the 1.5 MG Water Storage Tank at the Highland Hills Facility
|
More...
|
|
07-8602
|
8/9/07
|
Blue Wing Club Water Well Plugging Project
|
More...
|
|
06-5549
|
7/17/07
|
Nock Ave.: Cantrell to Clovis Project
|
More...
|
|
07-0114 & 07-0117
|
7/12/07
|
2007 Water Production Facility Painting & Rehabilitation Program of the 5.0 MG Water Storage Tanks at the Shields & Helotes Facility Projects
|
More...
|
|
07-1066 & 07-3001
|
7/10/07
|
Sundance Ranch Subdivision 16" Approach and 16" Border Water Main Project
|
More...
|
|
06-3005 & 06-1235
|
7/10/07
|
Silver Oaks 24” Oversize Approach and 24” Oversize Border Water Main Project
|
More...
|
|
07-5021
|
7/3/07
|
Goliad Road Drainage Channel Repair Project
|
More...
|
|
04-5026
|
6/12/07
|
Loop 1604 @ SH 151 Project
|
More...
|
|
07-5009 & 07-5509
|
6/5/07
|
FM 2252 ~ Loop 1604 to Evans Road Project
|
More...
|
|
07-1058
|
5/18/07
|
Shields High Service Level 12 Pump Station
|
More...
|
|
06-1190
|
5/17/07
|
Culebra Centre 48” Oversize Onsite Water Main Project
|
More...
|
|
99–4002 and 99-4505
|
5/15/07
|
Los Angeles Heights Water and Sanitary Sewer Main Replacement Phase I Project
|
More...
|
|
06-1790
|
5/8/07
|
River Rock Ranch, P.U.D. Off-Site Sanitary Sewer Improvements Project
|
More...
|
|
06-5026 & 06-5526
|
4/20/07
|
Hays Street-New Braunfels to N. Walters Water & Sewer Improvement Project
|
More...
|
|
07-0118
|
4/4/07
|
Annual 2007 Asphalt Overlay Work Order Construction Contract
|
More...
|
|
06-5052 & 06-5552
|
4/3/07
|
Loop 368 at Harry Wurzbach Water & Sewer Improvement Project
|
More...
|
|
06-5023 & 06-5523
|
3/20/07
|
Cedarhurst: Eaglerock to Valley Hi
|
More...
|
|
06-5034 & 06-5534
|
3/20/07
|
Aransas: Pine to New Braunfels- 2006/2007 City Street Maintenance Water & Sewer Replacement Project
|
More...
|
|
06-5024 & 06-5524
|
3/14/07
|
Callaghan-S. Presa to Labor Project
|
More...
|
|
06-5025
|
3/14/07
|
San Simeon-San Andres to Laven Project
|
More...
|
|
06-3003
|
2/15/07
|
Sonoma Verde 16 and 24-inch Oversize Approach Water Main Project
|
More...
|
|
03-6507
|
2/13/07
|
Medio Creek Water Recycling Center Project
|
More...
|
|
06-1222
|
1/31/07
|
IH-10 16-INCH WATER MAIN: WOODS AT FAIR OAKS AND VILLAGE GREEN PROJECT
|
More...
|
|
04-6504
|
1/26/07
|
Salado Creek Water Recycling Center Decommissioning Project
|
More...
|
|
06-8611
|
1/25/07
|
Salado Creek WRC Outfall Modification Project
|
More...
|
|
07-0111
|
1/23/07
|
West Oaks Estates Water System Improvements
|
More...
|
|
06-8603-207
|
1/23/07
|
Local Carrizo Phase 1A Well Drilling and Testing Project
|
More...
|
|
06-6006
|
1/19/07
|
Market St.Pump Station Well Piping Modification Project
|
More...
|
|
06-1709
|
1/11/07
|
Babcock Sanitary Sewer Main Extension Project
|
More...
|
|
06-7502
|
1/10/07
|
Market St. Pump Station, In-Line Chilled Water Booster Pump Project
|
More...
|
|
06-0109
|
12/12/06
|
Crownridge Lift Station – Demolition Project
|
More...
|
|
05-1240
|
12/12/06
|
Roft Road Service Level 8 Ground Storage Tank
|
More...
|
|
06-1129
|
12/7/06
|
Bulverde Road 24” Main Project
|
More...
|
|
99-4510
|
12/6/06
|
Western Watershed Sewer Relief Line (W-04) Project
|
More...
|
|
04-7005
|
12/5/06
|
Marnoch: Scenic Loop to Rafter S Trail Water Main Project
|
More...
|
|
06-0108
|
11/20/06
|
Saline Water Study West Bexar County Monitor Well Drilling Project,
|
More...
|
|
06-6505
|
11/16/06
|
Dos Rios Water Recycling Center Screw Pump Replacement Project - Phase II
|
More...
|
|
06-6006
|
11/14/06
|
Market St. Pump Station Well Piping Modification Project
|
More...
|
|
06-4507
|
11/9/06
|
Annual 2006 Pipe Bursting Work Order Construction Contract
|
More...
|
|
05-6003
|
10/31/06
|
Hildebrand Tank Demolition and Replacement Project
|
More...
|
|
06-0108
|
10/17/06
|
Saline Water Study-West Bexar County Monitor Well Drilling Project
|
More...
|
|
04-7004
|
10/10/06
|
Old Pearsall from Medina Base Road to Military Drive Water Main project
|
More...
|
|
05-6006
|
10/10/06
|
Market St. Pump Station On-Site Hypochlorite Generation Project
|
More...
|
|
06-3002 & 06-1127
|
9/7/06
|
Werner Tract 24” Oversize Border & 30” Oversize Approach Water Main Project
|
More...
|
|
06-8608-201
|
9/7/06
|
Haby Farm Irrigation Project
|
More...
|
|
06-8604-201
|
9/6/06
|
Deluxe Cattle Company Farm Irrigation Project
|
More...
|
|
03-8611-206
|
9/5/06
|
Carrizo Aquifer Storage and Recovery Program, Phase II Well Addition Project, Wellfield Construction Package
|
More...
|
|
06-0103 & 06-0105
|
8/30/06
|
2006 Water Production Facility Painting and Rehabilitation Program of the 5.0 MG and 50,000 Gallon MG Water Storage Tanks at the Artesia and Walden Heights Facility Projects
|
More...
|
|
06-0104
|
8/29/06
|
2006 Water Production Facility Painting and Rehabilitation Program of the 1.0 MG Water Storage Tank at the Dwyer Facility Project
|
More...
|
|
04-2505
|
8/24/06
|
Texas Research Park Transfer Main Lift Station Modifcations Project
|
More...
|
|
06-0106
|
7/27/06
|
Saline Water Study Bexar County Monitor Well Workover Project
|
More...
|
|
06-0107
|
7/27/06
|
Water Well Plugging Project
|
More...
|
|
05-8602
|
7/26/06
|
Blue Wing Club Recycled Water Service Connection Project
|
More...
|
|
05-8602
|
6/29/06
|
Blue Wing Club Water Well Plugging Project
|
More...
|
|
96-5007
|
6/27/06
|
City of Terrell Hills Northeast Patch & Seal Areas Project
|
More...
|
|
06_8613_206
|
6/22/06
|
SAWS Water Well Mitigation Program, Small Capacity Water Well Construction Project
|
More...
|
|
06-8612-206
|
6/21/06
|
SAWS Water Well Mitigation Program, Small Capacity Water Well Diagnostics Project
|
More...
|
|
06-3501
|
6/12/06
|
Afton Oaks 12” Sanitary Sewer Force Main Project
|
More...
|
|
05-3004
|
6/7/06
|
Sunset Station 12”, 24” Oversize & 30” Oversize Approach Water Main Project
|
More...
|
|
06-0101
|
6/1/06
|
Annual 2006 Concrete Placement Work Order Construction Contract
|
More...
|
|
03-8619
|
5/25/06
|
Salado Creek – Part II Recycled Water Line Realignment Project
|
More...
|
|
04-7006
|
5/11/06
|
Bandera Rd. Pressure Zone 7 30” Water Main Project
|
More...
|
|
05-8615-206
|
5/9/06
|
Carrizo Aquifer Storage and Recovery Program Water Treatment Plant Phase-II Improvements Project
|
More...
|
|
96-5007
|
3/28/06
|
City of Terrell Hills Northeast Patch & Seal Areas Project
|
More...
|
|
05-6503
|
3/28/06
|
Dos Rios Water Recycling Center: Waste-Hauler Station Project
|
More...
|
|
98-6016
|
3/21/06
|
FM 1937 Transmission Main From US 281 South to Pleasanton Road Project
|
More...
|
|
02-6016
|
3/16/06
|
Water Production Facilities Upgrade Project DP-1
|
More...
|
|
06-0102
|
3/15/06
|
Mitchell Lake Trans-Lake Pipeline Repair Project
|
More...
|
|
02-4504
|
3/7/06
|
Six Mile Creek Sewer Replacement Project
|
More...
|
|
05-6505
|
2/28/06
|
Dos Rios Water Recycling Center Screw Pump Replacement Project
|
More...
|
|
04-3501
|
2/21/06
|
Hart Avenue Sanitary Sewer Structure Reconstruction Project
|
More...
|
|
04-7002
|
2/16/06
|
Lincoln Heights Main Improvement & Pressure Zone Change Project
|
More...
|
|
03-3702
|
2/14/06
|
Brook Hollow Service Level Change Phase II Project
|
More...
|
|
04-7008
|
2/7/06
|
HWY 281: Oliver Ranch to Canyon Springs Water Main Project
|
More...
|
|
04-4001 & 04-4512
|
1/24/06
|
Valley Ridge Mobile Home Park Water & Sewer Replacement and Lift Station Design Services Project
|
More...
|
|
03-4002 & 03-4504
|
1/11/06
|
San Fernando Water and Sewer Main Replacement Project
|
More...
|
|
05-8618-201
|
1/10/06
|
Land Clearing & Preparation for Installation of Center Pivot Irrigation Systems Project
|
More...
|
|
05-0114
|
12/21/05
|
Dos Rios Water Recycling Center Underground Storage Tank (UST) Rehab Project
|
More...
|
|
04-7002
|
12/20/05
|
Lincoln Heights Main Improvement & Pressure Zone Change Project
|
More...
|
|
05-5008 & 05-5508
|
12/13/05
|
2004/2005 City Street Overlay Maintenance Water & Sewer Replacement Projects
|
More...
|
|
05-8608-207
|
12/2/05
|
Gonzales County Carrizo-Buckhorn Wellfield Access & Well Construction Project, Contract B
|
More...
|
|
03-8518-207
|
11/30/05
|
Gonzales County Carrizo-Buckhorn Wellfield Access & Well Construction Project,Contract A
|
More...
|
|
01-8630-203
|
11/22/05
|
Oliver Ranch Facility Expansion Project
|
More...
|
|
00-8046
|
11/22/05
|
IH-37 Bridge Water Main Project
|
More...
|
|
05-8614-206
|
11/18/05
|
Large Capacity Water Well Construction Project
|
More...
|
|
05-8613-206
|
11/16/05
|
Large Capacity Water Well Diagnostics Project
|
More...
|
|
03-8606
|
11/15/05
|
Convention Center’s Recycled Water Outfall #005 Project
|
More...
|
|
05-6503
|
11/10/05
|
Dos Rios Water Recycling Center Wastehauler Station Project
|
More...
|
|
05-0114
|
10/20/05
|
Dos Rios Water Recycling Center Underground Storage Tank (UST) Rehab Project
|
More...
|
|
06-0100
|
10/20/05
|
Annual 2006 Asphalt Overlay Work Order Construction Contract
|
More...
|
|
04-6505
|
10/19/05
|
Dos Rios Water Recycling Center Flow Equalization Basin Improvements Project – Phase 2
|
More...
|
|
05-5002 & 05-5502
|
10/13/05
|
2005 SAWS Street Maintenance Package 1- Project, Lee Hall St.-West Ave to Vance Jackson, Frost St.-West Ave to Vance Jackson Rd., Clower St.-West Ave. to Vance Jackson Rd.,Wildwood St.-West Ave to Vance Jackson Rd., Bekcy Renee Ave – Vereda St. to Lee Hal St., Nelda Ave.–Vereda St.to Gardina St.and Melbourne Ave.–Vereda St. to Gardina St., Water and Sewer Replacement Project
|
More...
|
|
05-5003 & 05-5503
|
10/13/05
|
2005 Street Maintenance Package 2 – Woley, Holy Cross, and Loma Park Water and Sewer System Improvement Project
|
More...
|
|
04-5530
|
10/11/05
|
Donaldson Terrace Phase 1A Project
|
More...
|
|
05-5004 & 05-5504
|
10/11/05
|
2005 Street Maintenance Project - Package 3 - Grimes Street: Commerce to Martin Luther King, and Rio Grande: Commerce to Martin Luther King Water and Sewer Replacement Project
|
More...
|
|
05-0108
|
10/5/05
|
Rehabilitation of the 1.0 MG Water Storage Tank at the Callaghan Facility Project
|
More...
|
|
05-0113
|
10/4/05
|
Culebra Well No.2 Test Pumping Project
|
More...
|
|
01-8630-203
|
9/20/05
|
Oliver Ranch Facility Expansion Project
|
More...
|
|
05-0108
|
8/30/05
|
Rehabilitation of the 1.0 MG Water Storage Tank at the Callaghan Facility Project
|
More...
|
|
05-0109
|
8/30/05
|
Rehabilitation of the 3.0 MG Hills Reservoir and Two (2) 5,000 Gallon Hydropneumatic Tank Projects
|
More...
|
|
05-5007
|
8/25/05
|
Dumbarton from Military to Copinsay Water Replacement Project
|
More...
|
|
05-5005
|
8/25/05
|
Eureka from Goliad to Dead End Water Replacement Project
|
More...
|
|
05-5006 & 05-5506
|
8/25/05
|
Lula Mae from W.W. White to Eddie Water & Sewer Replacement Project
|
More...
|
|
04-2504
|
8/24/05
|
Sanitary Sewer Infrastructure for South Suppliers of the Toyota Manufacturing Facility Project
|
More...
|
|
05-1123
|
8/23/05
|
Sunset Station 24” Oversize Border Water Main Project
|
More...
|
|
04-6702
|
8/16/05
|
Dos Rios Water Recycling Center Administration and Operations & Maintenance Buildings Roof Repair & HVAC Project
|
More...
|
|
05-3001
|
8/1/05
|
Stillwater Ranch Project
|
More...
|
|
05-0107
|
7/29/05
|
Leon Creek & Dos Rios WRC Paint/Coating Project
|
More...
|
|
99-3524
|
7/29/05
|
Pecan Grove Blvd. Sanitary Sewer Rehabilitation Project
|
More...
|
|
05-8611-215
|
7/28/05
|
Carrizo Aquifer Storage and Recovery Integration Program Phase II, Seale Pump Station 3.0 MG Tank
|
More...
|
|
02-3504
|
7/28/05
|
Olmos Sanitary Sewer Outfall Relay Project
|
More...
|
|
03-8604-215
|
7/26/05
|
Carrizo Aquifer Storage and Recovery Integration Project, Randolph & Seale Pumping Station Improvements
|
More...
|
|
05-1122 & 05-3003
|
7/26/05
|
Alamo Ranch Oversize Approach Main & On-Site Oversize Water Mains
|
More...
|
|
05-7505
|
7/26/05
|
Condensation Line and Steam Valve Replacement Project
|
More...
|
|
05-1094 and 05-3002
|
7/21/05
|
Stillwater Ranch Project
|
More...
|
|
04-1704
|
7/20/05
|
Medio Creek Oversize Sanitary Sewer Extension for Potranco Subdivision
|
More...
|
|
05-3004 & 05-1123
|
7/19/05
|
Sunset Station 24” Oversize & 30” Oversize Approach & 24” Oversize Border Water Main Project
|
More...
|
|
05-3503
|
7/1/05
|
Annual 2005 Cured-In-Place Pipe Work Order Construction Contract
|
More...
|
|
04-7702
|
6/30/05
|
San Antonio Water System Interior Remodeling Project
|
More...
|
|
05-8608-207
|
6/29/05
|
Gonzales County Carrizo-Buckhorn Wellfield Access & Well Construction PROJECT CANCELLED
|
More...
|
|
03-8518-207
|
6/29/05
|
Gonzales County Carrizo-Buckhorn Wellfield Access & Well Construction PROJECT CANCELLED
|
More...
|
|
02-3504
|
6/28/05
|
Olmos Sanitary Sewer Outfall Relay Project
|
More...
|
|
05-5001 & 05-5501
|
6/21/05
|
Comal Street / Union Pacific Railroad Project
|
More...
|
|
01-7005
|
6/9/05
|
Maltsberger North 30-inch Water Transmission Main Project
|
More...
|
|
03-8604-215
|
6/2/05
|
Carrizo Aquifer Storage and Recovery Integration Project, Randolph & Seale Pumping Station Improvements
|
More...
|
|
05-0106
|
5/26/05
|
2005 Large Diameter Sanitary Sewer Cleaning and Inspection Contract
|
More...
|
|
05-4506
|
5/24/05
|
Pecan Valley Dr. – “F” St. to “G” St. and “J” St. to Rigsby Ave. Sanitary Sewer Project
|
More...
|
|
99-2509
|
4/19/05
|
Espada Unsewered Area Sanitary Sewer Project
|
More...
|
|
02-4006
|
4/7/05
|
Brooks 16-inch Service Main Relocation Project
|
More...
|
|
05-3501
|
3/31/05
|
Annual 2005 Pipe Bursting Work Order Construction Contract
|
More...
|
|
04-6505
|
3/29/05
|
Dos Rios Water Recycling Center Flow Equalization Basin Improvements Project – Phase 2
|
More...
|
|
00-5531
|
3/22/05
|
Pecan Valley Aerial Crossing Enhancement Project
|
More...
|
|
05-0105
|
3/11/05
|
Saline Water Study
|
More...
|
|
04-6702
|
3/8/05
|
Dos Rios Water Recycling Center, Administration and Operations & Maintenance Buildings Project
|
More...
|
|
99-3530 & 03-4003
|
3/1/05
|
Gevers St. at Martin Luther King Dr. Sanitary Sewer Rehabilitation and Water Replacement Project
|
More...
|
|
. 03-8605-215
|
3/1/05
|
Carrizo Aquifer Storage and Recovery Integration Project, Transmission Pipeline Segment 6
|
More...
|
|
03-7002
|
2/22/05
|
Blanco To Errol 24” Water Transmission Main Project
|
More...
|
|
01-4509
|
2/8/05
|
Western Watershed Relief Line (W-Extension-A) Project, Phase III Lines B, C, D, and E
|
More...
|
|
03-6510
|
2/1/05
|
Environmental Laboratory Facility Project
|
More...
|
|
00-8111
|
1/25/05
|
Winwood 2.0 Million Gallon Ground Storage Tank and Pump Station Project
|
More...
|
|
N/A
|
1/17/05
|
The sale of the unimproved San Antonio Water System (SAWS) owned surplus property. This sale will be conducted under section 272.01 Texas Local Governement Code.
|
More...
|
|
05-0101
|
1/11/05
|
Annual 2005 Concrete Placement Work Order Construction Contract
|
More...
|
|
03-3006
|
1/11/05
|
21455 I.H. 10 WEST Project
|
More...
|
|
N/A
|
12/21/04
|
LEON CREEK WRC Clarifier Sandblasting and Coating Project
|
More...
|
|
N/A
|
12/21/04
|
DOS RIOS WRC Clarifier Sandblasting and Coating Project
|
More...
|
|
04-4503
|
12/16/04
|
Edwards Aquifer Rehabilitation Program.
|
More...
|
|
04-4509
|
12/16/04
|
Edwards Aquifer Rehabilitation Program
|
More...
|
|
04-4507
|
12/16/04
|
Edwards Aquifer Rehabilitation Program
|
More...
|
|
04-5028 & 04-5528
|
11/30/04
|
Donaldson Terrace Area Phase II-B Project
|
More...
|
|
99-6018
|
11/30/04
|
Southeast Loop 410 Project, Phase C from South Presa Street to Salado Creek Project
|
More...
|
|
03-6004
|
11/19/04
|
Micron Pump Station Phase II Project
|
More...
|
|
04-6705
|
11/18/04
|
Dos Rios Water Recycling Center Concrete Expansion Joint Project
|
More...
|
|
04-4505
|
11/16/04
|
Edwards Aquifer Rehabilitation Program
|
More...
|
|
04-4508
|
11/16/04
|
Edwards Aquifer Rehabilitation Program
|
More...
|
|
03-6514
|
11/2/04
|
Salado Creek WRC Distributed Control System Plant Interconnect Project.
|
More...
|
|
04-5042
|
11/2/04
|
Applewhite: Zarzarmora to Watson, Environmental Repsonse Support Services
|
More...
|
|
03-6308 & 03-6306
|
10/28/04
|
Rehabilitation of the two-0.50 MG and one-0.05 MG Water Storage Tanks at the Turtle Creek No. 2 and Dominion Facilities Project.
|
More...
|
|
01-7005
|
10/26/04
|
Maltsberger North 30-inch Water Transmission Main Project
|
More...
|
|
04-6712
|
10/21/04
|
Water Recycling Center at Leon Creek & Dos Rios, SPCC Concrete Containment Project.
|
More...
|
|
99-3554
|
10/21/04
|
Mountainclimb Lift Station Relocation Project
|
More...
|
|
03-8611-206
|
10/19/04
|
Carrizo Aquifer Storage and Recovery Project
|
More...
|
|
04-2503,04-6001 & 04-8618
|
10/15/04
|
San Antonio Water System Parking Garage Addition Project
|
More...
|
|
03-7002
|
10/14/04
|
Blanco To Errol 24” Water Transmission Main Project
|
More...
|
|
02-3503
|
10/14/04
|
Lullwood Ave. Sanitary Sewer Reroute Project.
|
More...
|
|
N/A
|
10/12/04
|
Medio Creek WRC Clarifier Sandblasting and Coating Project
|
More...
|
|
04-1111(Border) & 04-3003(Approach)
|
10/12/04
|
Silver Oaks 36” and 42” Oversize (12” Required) Approach and Border Main Project
|
More...
|
|
03-3703W,03-6523WW & 04-8617Recycle
|
10/7/04
|
Water, Wastewater and Recycle Infrastructure for Toyota Manufacturing Facility Project.
|
More...
|
|
04-4504
|
9/28/04
|
Edwards Aquifer Recharge Zone Point Repairs Package 1
|
More...
|
|
04-4502
|
9/28/04
|
Edwards Aquifer Recharge Zone Open Cut Ph-2
|
More...
|
|
94-4514 & 99-4516
|
9/21/04
|
Fairlawn Outfall/Goliad Rd.- Palfrey Dr. to Linn Rd.
|
More...
|
|
04-5036/04-5536
|
9/21/04
|
Donaldson Terrace Area – Cheryl Drive : Donaldson to Senisa Project
|
More...
|
|
03-6307
|
9/14/04
|
Rehabilitation of the 1.5 MG Water Storage Tank at the Austin Facility.
|
More...
|
|
03-6511
|
9/1/04
|
Castroville Road/ S.W. 38th Street Lift Station and Force Main Project.
|
More...
|
|
99-8024 & 03-7003
|
8/19/04
|
Interbranch Connection Segment 2 & 3 Water Recycling Program & Jackson-Keller to Oblate Water Main Project
|
More...
|
|
04-1633
|
8/17/04
|
Far West Area Private Participation Group Potranca Creek Outfall
|
More...
|
|
04-5013 & 04-5513
|
8/16/04
|
Donaldson Terrace Area Phase II-A Project
|
More...
|
|
03-8620
|
8/12/04
|
World Savings 24” Recycle Main Extension Project
|
More...
|
|
04-5001/04-5501
|
8/9/04
|
Guadalupe Street, IH 35 to Flores
|
More...
|
|
02-5020/02-5520
|
7/8/04
|
Sadie – Presa to Labor; Sadie – Labor to IH-37 and Vance – Presa to Labor; Water and Sewer System Improvement Project
|
More...
|
|
04-5006/04-5506
|
7/8/04
|
Paso Hondo St.: New Braunfels to N. Gevers St. and Live Oak St.: E. Houston St. to E. Crockett St.; for the 2004/2005 City Street Overlay/Maintenance Water & Sewer Replacement Projects.
|
More...
|
|
04-5004 & 04-5504
|
6/29/04
|
Ellor and Maria Elena Project
|
More...
|
|
01-7002
|
6/28/04
|
20” Water Main, UTSA Boulevard Project
|
More...
|
|
03-6511
|
6/24/04
|
Castroville Road/ S.W. 38th Street Lift Station and Force Main Project
|
More...
|
|
04-5005/04-5505 & CPS 3268226
|
6/21/04
|
Carolina: Presa to IH 37; Delaware: Labor to IH 37
|
More...
|
|
04-0101
|
6/18/04
|
Saline Study Monitor Well Drilling
|
More...
|
|
02-5018 & 02-5518
|
5/28/04
|
Ruiz Street -21st to 34th – Water and Sewer System Improvements Project
|
More...
|
|
04-1510
|
5/27/04
|
Boerne Stage Road Sewer Participation Group Sanitary Sewer Extension
|
More...
|
|
04-4501
|
5/20/04
|
Edwards Aquifer Rehabilitation Program
|
More...
|
|
04-4502
|
5/20/04
|
Edwards Aquifer Rehabilitation Program
|
More...
|
|
04-4503
|
5/20/04
|
Edwards Aquifer Rehabilitation Program
|
More...
|
|
04-4504
|
5/20/04
|
Edwards Aquifer Rehabilitation Program
|
More...
|
|
04-4505
|
5/20/04
|
Edwards Aquifer Rehabilitation Program
|
More...
|
|
04-4506
|
5/20/04
|
Edwards Aquifer Recharge Zone CIPP Sanitary Sewer Replacements and Improvements Project.
|
More...
|
|
04-4508
|
5/20/04
|
Edwards Aquifer Rehabilitation Program
|
More...
|
|
04-4509
|
5/20/04
|
Edwards Aquifer Rehabilitation Program
|
More...
|
|
02-5016/02-5516 & 02-5017/02-5517
|
5/18/04
|
Boerne-Carolina to Devine, Eager-Presa to Devine,and Hemphill -Benrus to Broadview - Water and Sewer System Improvements Project
|
More...
|
|
02-7003
|
5/6/04
|
Weybridge: Dover Ridge to Loop 1604 Project
|
More...
|
|
03-7509
|
5/4/04
|
Steam Return Line Replacement @ Alamo Street & Nueva Street Project
|
More...
|
|
04-8602-206
|
4/20/04
|
South Bexar Aquifer Storage and Recovery Large Capacity Water Well Project
|
More...
|
|
04-8603-206
|
4/20/04
|
South Bexar Aquifer Storage Large Capacity Water Well Diagnostics & Pump Service Project
|
More...
|
|
04-8604-206
|
4/20/04
|
South Bexar Aquifer Storage and Recovery Small Capacity Water Well Construction Project
|
More...
|
|
04-8605-206
|
4/20/04
|
South Bexar Aquifer Storage and Recovery Small Capacity Water Well Diagnostics and Pump Service Project
|
More...
|
|
04-0100
|
4/16/04
|
Annual 2004 Asphalt Overlay Work Order Construction Contract
|
More...
|
|
04-7501
|
3/15/04
|
Central Plant Boiler Reconstruction
|
More...
|
|
98-6021
|
2/26/04
|
Loop 1604:Blanco Rd. to Sigma Dr. Water Main Project, Phase II
|
More...
|
|
03-5022
|
2/18/04
|
Crockett Street Railroad Bore Project
|
More...
|
|
01-6005
|
2/13/04
|
County Line Temporary Booster Station and Tank Project
|
More...
|
|
04-8602-206
|
2/12/04
|
South Bexar County Aquifer Storage and Recovery Project, Large Capacity Water Well Drilling
|
More...
|
|
04-8603-206
|
2/12/04
|
South Bexar County Aquifer Storage and Recovery Project, Large Capacity Water Well Diagnostics & Pump Service
|
More...
|
|
04-8604-206
|
2/11/04
|
South Bexar County Aquifer Storage & Recovery Project, Small Capacity Water Well Construction
|
More...
|
|
04-8605-206
|
2/11/04
|
South Bexar County Aquifer Storage & Recovery Project, Small Capacity Water Well Diagnostics & Pump Service
|
More...
|
|
Conservation Dept
|
1/6/04
|
Landscape Demonstration Garden
|
More...
|
|
02-6506
|
12/16/03
|
San Antonio Ranch WRC Elimination Project
|
More...
|
|
99-6004
|
12/5/03
|
North East Loop 410 Water Main Extension Project
|
More...
|
|
01-8624
|
12/2/03
|
Winwood Tank/I.H.10 Water Main Project
|
More...
|
|
00-8141
|
11/25/03
|
San Fernando Water Company Upgrade, Phase I Project
|
More...
|
|
03-3505
|
11/24/03
|
Leon Creek Long Term Monitoring Network Project
|
More...
|
|
02-6516
|
11/21/03
|
Medina River Bank Stabilization at the Dos Rios Water Recycling Center Project
|
More...
|
|
03-5005
|
11/18/03
|
Hildebrand Avenue 20-Inch Water Main Adjustment Project
|
More...
|
|
02-7002
|
11/14/03
|
Robinhood: Nacogdoches to New Braunfels Project
|
More...
|
|
02-6520
|
11/13/03
|
Dos Rios Water Recycling Center Digester Rehabilitation and Modifications Project, Phases 3 and 4
|
More...
|
|
03-5014 & 03-5511
|
10/23/03
|
Donaldson Terrace- Phase I Water & Sewer System Improvement Project
|
More...
|
|
02-4007
|
10/16/03
|
Brooks City-Base, Texas Project
|
More...
|
|
02-6001
|
10/15/03
|
Culebra Pump Station Drill Deep Well No. 2 Project
|
More...
|
|
03-7005
|
10/7/03
|
Encino Royale: Encino Rio to Encino Cliff Project
|
More...
|
|
02-6018-003 & 02-6018-004
|
9/23/03
|
Rehabilitation of the 0.50 and 0.033 MG Water Storage Tank at the Encino Park and Cedar Creek Station Project
|
More...
|
|
02-6018-001 & 02-6018-002
|
9/23/03
|
Rehabilitation of the 5.0 and 0.27 MG Water Storage Tank at the Marbach and Helotes Park No. 3 Station Project
|
More...
|
|
03-8612
|
9/17/03
|
SAWS Facility Landscaping Project
|
More...
|
|
94-4513
|
8/12/03
|
Meadow Village West Sanitary Sewer Replacement Project
|
More...
|
|
03-3507
|
7/31/03
|
Annual 2003 Pipe Bursting Work Order Construction Contract
|
More...
|
|
03-3506
|
7/29/03
|
Annual 2003 Cured-In-Place Pipe Work Order Construciton Contract
|
More...
|
|
03-3001
|
7/17/03
|
5911 & 6005 Camp Bullis Water Main Extension
|
More...
|
|
02-3004 and 03-3005
|
7/15/03
|
Water Main Extension Projects I-2003
|
More...
|
|
01-7004
|
7/9/03
|
Marshall/Bulverde to Marshall/Evans Reservoir
|
More...
|
|
03-1599
|
7/2/03
|
IH-10 Participation Group Off-Site Sanitary Sewer Replacement
|
More...
|
|
01-4508
|
7/1/03
|
Western Watershed Line (-Extension-A) Project
|
More...
|
|
03-0101
|
6/5/03
|
Annual 2003 Concrete Placement Job Order Construction Contract
|
More...
|
|
02-5510
|
4/10/03
|
Mockert Area Streets Sanitary Sewer Rehabilitation Project
|
More...
|
|
01-0001
|
3/25/03
|
Helotes Ranch Acres Pressure Reducing Valve Installation Project
|
More...
|
|
01-8622
|
3/21/03
|
BSR Well Nos. 3 and 4 Mains and Pumping Facilities Project
|
More...
|
|
02-7006
|
3/13/03
|
Braun Road Project
|
More...
|
|
02-5528
|
3/6/03
|
Southside Independent School District - Wastewater Consolidation System
|
More...
|
|
02-0100
|
1/28/03
|
Annual Asphalt Recyling and Overlay Construction Contract
|
More...
|
|
02-0011
|
1/21/03
|
9865 Tower View Water Main Extension Project
|
More...
|
|
02-3003
|
1/7/03
|
Menn Tract 36-inch Oversize Approach Water Main Project
|
More...
|
|
02-6008
|
12/9/02
|
the Grissom Road Tank Project
|
More...
|
|
01-7003
|
12/5/02
|
Potranco and SH 151 Water Transmission Main Project
|
More...
|
|
02-8607-207
|
12/4/02
|
Gonzales County Monitoring Well Drilling Project
|
More...
|
|
02-6004
|
12/3/02
|
Fawn Standpipe and University Hills Pump Station Project
|
More...
|
|
99-8011
|
11/19/02
|
the Dos Rios Recycled Water Pump Station
|
More...
|
|
02-6515
|
10/21/02
|
Leon Creek, Salado Creek, and Dos Rios Water Recycling Centers Interconnections Modifications Part B
|
More...
|
|
02-3002
|
10/16/02
|
Springs at Boerne Stage 20-inch Oversize Approach Main Water Distribution System Project
|
More...
|
|
02-6510
|
10/10/02
|
Dos Rios Water Recycling Center Groundwater Protection and Monitoring Project
|
More...
|
|
01-6514
|
10/8/02
|
Mitchell Lake Wetlands-House, Amenities, and Dike Repair Project
|
More...
|
|
02-7504
|
10/2/02
|
Central Plant Heating and Cooling Upgrades Project
|
More...
|
|
02-3506
|
9/12/02
|
Wagner avenue Sanitary Sewer Replacement Project
|
More...
|
|
00-7006
|
9/6/02
|
5.0MG Water Storage Tank at the Helotes Station Project
|
More...
|
|
00-7005 & 00-7009
|
9/5/02
|
5.0 and .55MG Water Storage Tank at the Bitters and Marshall Station Project
|
More...
|
|
99-4514
|
8/21/02
|
Sanitary Sewer Outfall Siphons, siphons 1 and 2
|
More...
|
|
00-7008
|
8/20/02
|
0.8 MG Water Storage Tank at the Market Station Project
|
More...
|
|
98-6509
|
7/18/02
|
Salado Creek and Dos Rios WRC Interconnection Lines
|
More...
|
|
00-8141
|
7/12/02
|
San Fernando Water Company Upgrade Phase I Project
|
More...
|
|
01-3001
|
7/10/02
|
Alamo Farmsteads Subdivision, (Approach Main) and (Border Main)
|
More...
|
|
02-1039
|
7/9/02
|
Dr. Joe Ward Elementary School Project
|
More...
|
|
99-4003 and 99-4504
|
7/8/02
|
Golden Valley Water and Sewer Replacement Project
|
More...
|
|
02-6508
|
7/3/02
|
Dos Rios Water Recycling Center HVAC Upgrade Project
|
More...
|
|
02-1045
|
7/2/02
|
Shavano Park, Unit-19, 20-inch Oversize Border Water Line Extension Project
|
More...
|
|
02-7504
|
6/28/02
|
Central Plant Heating and Cooling Upgrades Project
|
More...
|
|
01-8608-206A
|
6/25/02
|
Carrizo Aquifer Storage and Recovery Program
|
More...
|
|
01-8609-206
|
6/20/02
|
Aquifer Storage and Recovery Project, Transmission Pipeline Segment II
|
More...
|
|
01-8610-206
|
6/19/02
|
Carrizo ASR Program, ASR Water Transmission Pipeline Design 2B Project
|
More...
|
|
99-4517
|
6/11/02
|
West Salado Creek Outfall Lift Station Elimination Project, Phase II
|
More...
|
|
01-8618-215
|
6/7/02
|
Aquifer Storage and Recovery Program, Segment III Project
|
More...
|
|
01-8619-215
|
6/6/02
|
ASR Integration Program, Transmission Main Segment IV
|
More...
|
|
01-8620-215
|
6/6/02
|
ASR Integration Program Artesia and Seale Pumping Station Improvements
|
More...
|
|
01-8607-206 and 01-8611-206
|
6/4/02
|
Carrizo Aquifer Storage and Recovery Program, Treatment Plant and High Service Pump Station
|
More...
|