Accessibility Feature: Click here to skip main page navigation.
San Antonio Water System Home
Who We Are Our Water Conservation Customer Service Infrastructure Education Environment Jobs at SAWS Business Center
Search

IN THIS SECTION:

Main

Current Invitations to Bid

Bid Results

Subcontractor / Subconsultant Report Form

Construction Bids
Bid Results

Unofficial/untabulated results of recent bids:
Job No.
Closing Date
Project Name
Details
09-8616-203 & 09-8617-204
11/20/09
Oliver Ranch Wells #5 & #9 and BSR #2 Well Rehabilitation Project
More...
02-3514
11/18/09
Roosevelt Avenue Sewer Main Rehabilitation Project
More...
08-6501
11/17/09
Dos Rios and Leon Creek Water Recycling Centers Tertiary Filters Project
More...
07-2503
11/17/09
Twin 72-inch Sewer Replacement Project
More...
03-6505
11/16/09
Dos Rios WRC Digester Gas Transfer Utilities Project
More...
07-6002-112
11/6/09
Culebra Pump Station Project
More...
09-2315
11/5/09
Crown Meadows Lift Station 124 Elimination Project
More...
08-4501
11/2/09
Wastewater Collection System Small Main Rehabilitation at Focus Areas – Pipebursting Method Method
More...
08-4501
11/2/09
Wastewater Collection System Small Main Rehabilitation at Focus Areas – Cured in Place Pipe (CIPP) Lining Method
More...
07-7001
10/28/09
24-Inch Transmission Main from Loop 410 to FM 1937 Phase 2 Project
More...
09-8608-201,09-8609-201, & 09-8610-201
10/22/09
Pivot Irrigation System Installation at Franklin, Pratt & Watkins(North & South) Farms Project
More...
07-8601-202
10/20/09
Medio Creek WRC Recycled Water Pump Station and Line Project
More...
06-8625
10/19/09
Primary and Secondary Well Metering Project
More...
09-4512
10/8/09
2009 Open Cut Sewer Construction Contract Project
More...
08-6504
10/7/09
Dos Rios WRC Sludge Thickening and Aeration System Improvements Project
More...
09-6007
9/30/09
Salado Pump Station Improvement Project
More...
09-2521
9/29/09
Central Watershed Sewer Relief Line (C-02) Phase II
More...
09-2519
9/25/09
Central Watershed Sewer Relief Main (C-01)
More...
09-7004
9/24/09
Whitewood from Medina Base Rd. to S.W. Military Dr. Water Main Project
More...
CAP3109101
9/23/09
SAWS Headquarters Condensate Recovery Construction Project
More...
09-2520
9/23/09
Central Watershed Sewer Relief Line (CO-1) Phase I (Rehabilitation)
More...
08-2502
9/15/09
Lift Station Elimination Phase I
More...
09-0109
9/4/09
Water Production Sidewalk and Paving Improvements Project
More...
09-5054 & 09-5554
9/4/09
San Antonio River Improvement Historic Mission Reach, Phase III, Project
More...
08-1144
9/3/09
Shavano Park Unit 19A, Ph 1, Commercial (12 Inch Required, 20-Inch Oversize) Project
More...
09-2503
9/3/09
Odor Control Stations Rehabilitation, Phase II Project
More...
09-6006
9/1/09
2009 Well Plugging and Facility Demolition Project
More...
09-6003
8/31/09
Sunset Pump Station Improvements Project
More...
09-0104
8/10/09
S.S.C. Meter Shop Electrical Improvements Project
More...
05-5012 & 05-5512
7/28/09
Donaldson Terrace Area Phase IIC Project
More...
09-5015
7/28/09
FM2252 (Nacogdoches): Loop1604 to Evans Road (24-inch Water Main Adjustment Project.
More...
09-5516
7/27/09
San Antonio River Improvement Historic Mission Reach, Phase IIC Project
More...
07-3005
7/23/09
Front Gate at Fair Oaks Ranch Approach Main 24-inch Oversize (12-inch Required) Project
More...
09-0113 & 09-1401
7/22/09
2009 Annual Water Distribution Leak Repair, Package 2
More...
07-6001
7/13/09
Watson Elevated Storage Tank Project
More...
09-0111 and 09-1401
7/10/09
2009 Annual Water Distribution Leak Repair Project
More...
07-7001
6/30/09
24-Inch Transmission Main from Loop 410 to FM 1937 Phase 2 Project
More...
93-4509
6/30/09
Old Salado Creek Siphon Replacement Project
More...
09-6504
6/15/09
DOS RIOS WRC BOILER & SOFTENER REPLACEMENT PROJECT ( B-09-013-MR)
More...
09-0108 (O&M) and 09-1402 (CIP)
6/11/09
2009 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Contract
More...
09-0107
6/9/09
Annual 2009 Asphalt Overlay Work Order Construction Contract
More...
09-4511
6/5/09
Annual 2009 Pipe Bursting Work Order Construction Contract Project
More...
09-4510
6/5/09
Annual 2009 Cured-In-Place Pipe Work Order Construction Contract Project
More...
09-8606-207
6/4/09
Local Carrizo Program Offsite Well Collection Project
More...
09-5034 & 09-5534
6/4/09
SAWS Water & Sewer Construction Contract Package IV
More...
09-5033 & 09-5533
6/2/09
SAWS Water & Sewer Construction Contract Package III, Project
More...
08-6003
5/21/09
Water Production Facility Upgrades Phase II – Bitters and Sutton Pump Stations Project
More...
08-2505
5/7/09
Lift Stations SCADA Project
More...
08-4501
5/6/09
Find-It/Fix-It Wastewater Main Cleaning and Inspection in the GS-02 Sub-Basin
More...
93-4509
5/5/09
Old Salado Creek Siphon Replacement Project
More...
08-7501
5/5/09
Hemisfair Park Condensate Return Line Replacement Project
More...
05-4002
4/29/09
Brooks City-Base Water Improvement Project
More...
09-0105
4/7/09
2009 Excavation and Backfill Work Order Construction Contract
More...
09-5024 & 09-5524
4/2/09
Leigh St: Presa to Labor Water & Sewer Main Replacement Project
More...
96-5611 & 08-5584
4/2/09
Terrell Hills Water & Sewer Main Replacement Project, Phase 1
More...
09-5032 & 09-5532
4/1/09
SAWS Water & Sewer Construction Contract, Package II Project
More...
09-5031 & 09-5531
3/31/09
SAWS Water & Sewer Construction Contract, Package I Project
More...
05-8615-206
3/25/09
Twin Oaks Water Treatment Plant 12-Inch Plug Valve Replacement Project
More...
06-4003
2/10/09
Kelly USA Pressure Zone 4 Water Infrastructure Improvements
More...
07-3006
2/9/09
The Winwood Phase 2, 24-inch Oversize Approach Main (12-inch Required) Project
More...
08-5083
1/14/09
Bradford: Camino Santa Maria to Tulane
More...
08-7501
12/3/08
The Hemisfair Park Condensate Return Line Replacement Project.
More...
08-3003
11/18/08
The Windwood 24-inch Water Oversize Approach Main (12-inch Required)
More...
06-6003
11/17/08
General McMullen Elevated Storage Tank Project
More...
04-4004 & 04-4515
11/12/08
Lackland Terrace Water and Sanitary Sewer Main Improvements Phase I Project
More...
08-7016-113
11/11/08
Indian Hills Pump Station Pressure Zone 12
More...
07-3011
11/7/08
The Windwood 24-inch Water Oversize Approach Main, Phase I, (12-inch Required) Project
More...
08-7706 & 08-7704
10/21/08
Rilling Road Spoils Yard Project
More...
07-7002
10/20/08
Prue Rd. to Bamberger 30” Water Transmission Main Project
More...
08-6005
10/17/08
Culebra Pump Station No. 4 Well Project
More...
07-6004
10/17/08
Babcock Elevated Storage Tank
More...
07-5549.
10/15/08
U.S. Hwy 281:Mud Creek to Stone Oak Pkwy (Lift Station Removal No. 158)
More...
08-0101 & 08-0114
10/14/08
2008 Water Production Facility Painting & Rehabilitation Project - Package II
More...
07-0004
10/13/08
US 281 S. at Medina River 12-Inch Water Main Replacement Project
More...
07-6005
10/10/08
Wayland Floating Ground Storage Tank Project
More...
08-3002
10/9/08
Lazy M Ranch Subdivision Project
More...
07-2505
10/8/08
Odor Control Stations Project Ferrous Sulfate Injection Stations
More...
06-6502
10/8/08
Leon Creek Water Recycling Center Improvements Phase 2
More...
07-5016 & 07-5516
10/2/08
Mahncke Park Area Streets: New Braunfels (Eleanor to Pershing) Project
More...
08-8601-202 & 08-8602-202
9/12/08
Recycled Water Improvements
More...
05-2502
9/9/08
the Central Watershed Sewer Relief Line (C-02)
More...
08-0102
8/19/08
3.0 MG Water Standpipe at the Indian Springs Facility Project
More...
06-8603-207
8/15/08
Local Carrizo Program Offsite Drilling and Testing Project
More...
07-3012
8/11/08
Cielo Vista 30-Inch & 24-Inch Oversize Approach Water Mains Project
More...
07-3014
8/11/08
Cielo Vista 24-Inch Oversized (12-Inch Required) On-Site Water Main Project
More...
08-0110
7/30/08
Excavation and Backfill Work Order Construction Contract
More...
07-3015
7/22/08
the Sanctuary Oversize Approach and Border 24-Inch Water Main Project
More...
99-4508
7/21/08
Eastern Watershed Sewer Relief Line (E-03) Project
More...
07-7000-112
7/16/08
Anderson-Micron 48” Water Main – Segment III Project
More...
07-1153
7/8/08
Tesoro Ridge Subdivision Project
More...
08-4511
7/7/08
Annual 2008 Pipebursting Work Order Construction Contract Project
More...
08-0106
6/20/08
Small Sized (0 to 15 SY) Concrete Placement Work Order Construction Contract
More...
08-0108
6/20/08
Large Sized (> 15 SY) Concrete Placement Work Order Construction Contract
More...
07-6508
6/10/08
Dos Rios Water Recycling Center (WRC) Flow Equalization Basin (FEB) Diversion Project
More...
07-5059 & 07-5559
6/10/08
Haven For Hope
More...
07-7000
6/5/08
Anderson-Micron 48" Water Main - Segment III
More...
08-4507
5/23/08
Annual 2008 Cured-In-Place Pipe Work Order Construction Contract
More...
07-6008
5/20/08
University Pump Station (P.S.) High Service Pump #2 Addition Project
More...
07-8605 & 08-8603
5/14/08
Wiseman Boulevard and Northwest Vista College Recycled Water Main Extension Project
More...
07-5032
5/6/08
IH 35: IH 410 @ Binz Engleman to 0.2 miles North Of Rittiman Road Project
More...
08-6506
4/24/08
Dos Rios Water Recycling Center New Lab Irrigation Project
More...
06-6007
4/10/08
Market Street Pump Station Improvements Project,
More...
08-8606-202
4/1/08
Dos Rios Recycled Water Pump Station Pedestal Improvements Project
More...
07-5055
3/11/08
Ivy Lane - Amesbury to Clement Circle
More...
06-6503
1/17/08
Water Recycling Centers Disinfection System Evaluation and Performance Upgrade Project
More...
08-8605-201
1/16/08
Mallard Farm Pivot Irrigation System Project
More...
08-8606-201
1/16/08
Lindenborn Farm Pivot Irrigation System Project
More...
08-8607-201
1/16/08
Conrad Farm Pivot Irrigation System
More...
08-8609-201
1/16/08
Walton Farm Pivot Irrigation System Project
More...
07-6011 & 07-0123
11/16/07
Well Plugging/Facility Demolition Project
More...
07-7500
11/15/07
No. 2 Chilled Water Plant Chiller Addition Project
More...
99-4002 & 99-4505
11/13/07
Los Angeles Heights Water Main and Sanitary Sewer Replacement Phase I Project
More...
02-4003 & 02-4505
11/8/07
Lakeside Village Water & Sewer Improvements Project
More...
99-4515
11/8/07
Salado Sanitary Sewer Outfall Siphons, Siphon Nos. 8, 9, and 10 Project
More...
07-4500
11/6/07
Annual 2007 Cured-In-Place Pipe Work Order Construction Contract
More...
05-4001 & 05-4501
10/30/07
San Fernando Water and Sewer Main Replacement – Phase III
More...
06-6503
10/25/07
Water Recycling Centers Disinfection System Evaluation and Performance Upgrade Project
More...
02-4503
10/22/07
Lift Stations Rehabilitation - Phase 1 Project
More...
07-5019
10/18/07
US 87 @ SALADO CREEK Project,
More...
07-5505
10/17/07
U.S. Hwy 281: Mud Creek to Stone Oak Parkway Lift Station Removal
More...
06-6005
10/17/07
Broadview Tank Project
More...
04-5026
10/16/07
Loop 1604 @ SH 151 Project
More...
94-4502
10/3/07
South Area Lift Stations Elimination Project
More...
04-5039 & 04-5539
9/18/07
San Antonio River Improvement Historic Mission Reach, Phase I
More...
06-7001
9/14/07
Talley Road: FM 471 to Ray Lieck Project
More...
07-0100 and 07-6010
9/13/07
Lost Lane Standpipe, University Hills Pump Station, Hunter’s Chase Lift Station, and No. 152 Lift Station
More...
07-0124
9/11/07
Edwards Aquifer monitor well for the Saline Water Study
More...
07-5012 & 07-5512
9/11/07
US 90 @ OLD HWY 90 Project
More...
07-1515
9/7/07
Alamo Ranch/Medio Creek South Sanitary Sewer Outfall Project
More...
07-1070
9/5/07
Presidio Heights, Phase I 20” Oversized (12” Required) On-Site Water Main Project
More...
07-1068 & 07-3003
9/5/07
Bloomfield Hills 30" Oversize Border & 30" Oversize Approach Water Main
More...
04-5039 & 04-5539
8/23/07
San Antonio River Improvement Historic Mission Reach, Phase I Project,
More...
06_8603_207
8/16/07
Local Carrizo Program, Onsite Well Collection Project
More...
07-0116
8/14/07
Rehabilitation of the 1.5 MG Water Storage Tank at the Highland Hills Facility
More...
07-8602
8/9/07
Blue Wing Club Water Well Plugging Project
More...
06-5549
7/17/07
Nock Ave.: Cantrell to Clovis Project
More...
07-0114 & 07-0117
7/12/07
2007 Water Production Facility Painting & Rehabilitation Program of the 5.0 MG Water Storage Tanks at the Shields & Helotes Facility Projects
More...
07-1066 & 07-3001
7/10/07
Sundance Ranch Subdivision 16" Approach and 16" Border Water Main Project
More...
06-3005 & 06-1235
7/10/07
Silver Oaks 24” Oversize Approach and 24” Oversize Border Water Main Project
More...
07-5021
7/3/07
Goliad Road Drainage Channel Repair Project
More...
04-5026
6/12/07
Loop 1604 @ SH 151 Project
More...
07-5009 & 07-5509
6/5/07
FM 2252 ~ Loop 1604 to Evans Road Project
More...
07-1058
5/18/07
Shields High Service Level 12 Pump Station
More...
06-1190
5/17/07
Culebra Centre 48” Oversize Onsite Water Main Project
More...
99–4002 and 99-4505
5/15/07
Los Angeles Heights Water and Sanitary Sewer Main Replacement Phase I Project
More...
06-1790
5/8/07
River Rock Ranch, P.U.D. Off-Site Sanitary Sewer Improvements Project
More...
06-5026 & 06-5526
4/20/07
Hays Street-New Braunfels to N. Walters Water & Sewer Improvement Project
More...
07-0118
4/4/07
Annual 2007 Asphalt Overlay Work Order Construction Contract
More...
06-5052 & 06-5552
4/3/07
Loop 368 at Harry Wurzbach Water & Sewer Improvement Project
More...
06-5023 & 06-5523
3/20/07
Cedarhurst: Eaglerock to Valley Hi
More...
06-5034 & 06-5534
3/20/07
Aransas: Pine to New Braunfels- 2006/2007 City Street Maintenance Water & Sewer Replacement Project
More...
06-5024 & 06-5524
3/14/07
Callaghan-S. Presa to Labor Project
More...
06-5025
3/14/07
San Simeon-San Andres to Laven Project
More...
06-3003
2/15/07
Sonoma Verde 16 and 24-inch Oversize Approach Water Main Project
More...
03-6507
2/13/07
Medio Creek Water Recycling Center Project
More...
06-1222
1/31/07
IH-10 16-INCH WATER MAIN: WOODS AT FAIR OAKS AND VILLAGE GREEN PROJECT
More...
04-6504
1/26/07
Salado Creek Water Recycling Center Decommissioning Project
More...
06-8611
1/25/07
Salado Creek WRC Outfall Modification Project
More...
07-0111
1/23/07
West Oaks Estates Water System Improvements
More...
06-8603-207
1/23/07
Local Carrizo Phase 1A Well Drilling and Testing Project
More...
06-6006
1/19/07
Market St.Pump Station Well Piping Modification Project
More...
06-1709
1/11/07
Babcock Sanitary Sewer Main Extension Project
More...
06-7502
1/10/07
Market St. Pump Station, In-Line Chilled Water Booster Pump Project
More...
06-0109
12/12/06
Crownridge Lift Station – Demolition Project
More...
05-1240
12/12/06
Roft Road Service Level 8 Ground Storage Tank
More...
06-1129
12/7/06
Bulverde Road 24” Main Project
More...
99-4510
12/6/06
Western Watershed Sewer Relief Line (W-04) Project
More...
04-7005
12/5/06
Marnoch: Scenic Loop to Rafter S Trail Water Main Project
More...
06-0108
11/20/06
Saline Water Study West Bexar County Monitor Well Drilling Project,
More...
06-6505
11/16/06
Dos Rios Water Recycling Center Screw Pump Replacement Project - Phase II
More...
06-6006
11/14/06
Market St. Pump Station Well Piping Modification Project
More...
06-4507
11/9/06
Annual 2006 Pipe Bursting Work Order Construction Contract
More...
05-6003
10/31/06
Hildebrand Tank Demolition and Replacement Project
More...
06-0108
10/17/06
Saline Water Study-West Bexar County Monitor Well Drilling Project
More...
04-7004
10/10/06
Old Pearsall from Medina Base Road to Military Drive Water Main project
More...
05-6006
10/10/06
Market St. Pump Station On-Site Hypochlorite Generation Project
More...
06-3002 & 06-1127
9/7/06
Werner Tract 24” Oversize Border & 30” Oversize Approach Water Main Project
More...
06-8608-201
9/7/06
Haby Farm Irrigation Project
More...
06-8604-201
9/6/06
Deluxe Cattle Company Farm Irrigation Project
More...
03-8611-206
9/5/06
Carrizo Aquifer Storage and Recovery Program, Phase II Well Addition Project, Wellfield Construction Package
More...
06-0103 & 06-0105
8/30/06
2006 Water Production Facility Painting and Rehabilitation Program of the 5.0 MG and 50,000 Gallon MG Water Storage Tanks at the Artesia and Walden Heights Facility Projects
More...
06-0104
8/29/06
2006 Water Production Facility Painting and Rehabilitation Program of the 1.0 MG Water Storage Tank at the Dwyer Facility Project
More...
04-2505
8/24/06
Texas Research Park Transfer Main Lift Station Modifcations Project
More...
06-0106
7/27/06
Saline Water Study Bexar County Monitor Well Workover Project
More...
06-0107
7/27/06
Water Well Plugging Project
More...
05-8602
7/26/06
Blue Wing Club Recycled Water Service Connection Project
More...
05-8602
6/29/06
Blue Wing Club Water Well Plugging Project
More...
96-5007
6/27/06
City of Terrell Hills Northeast Patch & Seal Areas Project
More...
06_8613_206
6/22/06
SAWS Water Well Mitigation Program, Small Capacity Water Well Construction Project
More...
06-8612-206
6/21/06
SAWS Water Well Mitigation Program, Small Capacity Water Well Diagnostics Project
More...
06-3501
6/12/06
Afton Oaks 12” Sanitary Sewer Force Main Project
More...
05-3004
6/7/06
Sunset Station 12”, 24” Oversize & 30” Oversize Approach Water Main Project
More...
06-0101
6/1/06
Annual 2006 Concrete Placement Work Order Construction Contract
More...
03-8619
5/25/06
Salado Creek – Part II Recycled Water Line Realignment Project
More...
04-7006
5/11/06
Bandera Rd. Pressure Zone 7 30” Water Main Project
More...
05-8615-206
5/9/06
Carrizo Aquifer Storage and Recovery Program Water Treatment Plant Phase-II Improvements Project
More...
96-5007
3/28/06
City of Terrell Hills Northeast Patch & Seal Areas Project
More...
05-6503
3/28/06
Dos Rios Water Recycling Center: Waste-Hauler Station Project
More...
98-6016
3/21/06
FM 1937 Transmission Main From US 281 South to Pleasanton Road Project
More...
02-6016
3/16/06
Water Production Facilities Upgrade Project DP-1
More...
06-0102
3/15/06
Mitchell Lake Trans-Lake Pipeline Repair Project
More...
02-4504
3/7/06
Six Mile Creek Sewer Replacement Project
More...
05-6505
2/28/06
Dos Rios Water Recycling Center Screw Pump Replacement Project
More...
04-3501
2/21/06
Hart Avenue Sanitary Sewer Structure Reconstruction Project
More...
04-7002
2/16/06
Lincoln Heights Main Improvement & Pressure Zone Change Project
More...
03-3702
2/14/06
Brook Hollow Service Level Change Phase II Project
More...
04-7008
2/7/06
HWY 281: Oliver Ranch to Canyon Springs Water Main Project
More...
04-4001 & 04-4512
1/24/06
Valley Ridge Mobile Home Park Water & Sewer Replacement and Lift Station Design Services Project
More...
03-4002 & 03-4504
1/11/06
San Fernando Water and Sewer Main Replacement Project
More...
05-8618-201
1/10/06
Land Clearing & Preparation for Installation of Center Pivot Irrigation Systems Project
More...
05-0114
12/21/05
Dos Rios Water Recycling Center Underground Storage Tank (UST) Rehab Project
More...
04-7002
12/20/05
Lincoln Heights Main Improvement & Pressure Zone Change Project
More...
05-5008 & 05-5508
12/13/05
2004/2005 City Street Overlay Maintenance Water & Sewer Replacement Projects
More...
05-8608-207
12/2/05
Gonzales County Carrizo-Buckhorn Wellfield Access & Well Construction Project, Contract B
More...
03-8518-207
11/30/05
Gonzales County Carrizo-Buckhorn Wellfield Access & Well Construction Project,Contract A
More...
01-8630-203
11/22/05
Oliver Ranch Facility Expansion Project
More...
00-8046
11/22/05
IH-37 Bridge Water Main Project
More...
05-8614-206
11/18/05
Large Capacity Water Well Construction Project
More...
05-8613-206
11/16/05
Large Capacity Water Well Diagnostics Project
More...
03-8606
11/15/05
Convention Center’s Recycled Water Outfall #005 Project
More...
05-6503
11/10/05
Dos Rios Water Recycling Center Wastehauler Station Project
More...
05-0114
10/20/05
Dos Rios Water Recycling Center Underground Storage Tank (UST) Rehab Project
More...
06-0100
10/20/05
Annual 2006 Asphalt Overlay Work Order Construction Contract
More...
04-6505
10/19/05
Dos Rios Water Recycling Center Flow Equalization Basin Improvements Project – Phase 2
More...
05-5002 & 05-5502
10/13/05
2005 SAWS Street Maintenance Package 1- Project, Lee Hall St.-West Ave to Vance Jackson, Frost St.-West Ave to Vance Jackson Rd., Clower St.-West Ave. to Vance Jackson Rd.,Wildwood St.-West Ave to Vance Jackson Rd., Bekcy Renee Ave – Vereda St. to Lee Hal St., Nelda Ave.–Vereda St.to Gardina St.and Melbourne Ave.–Vereda St. to Gardina St., Water and Sewer Replacement Project
More...
05-5003 & 05-5503
10/13/05
2005 Street Maintenance Package 2 – Woley, Holy Cross, and Loma Park Water and Sewer System Improvement Project
More...
04-5530
10/11/05
Donaldson Terrace Phase 1A Project
More...
05-5004 & 05-5504
10/11/05
2005 Street Maintenance Project - Package 3 - Grimes Street: Commerce to Martin Luther King, and Rio Grande: Commerce to Martin Luther King Water and Sewer Replacement Project
More...
05-0108
10/5/05
Rehabilitation of the 1.0 MG Water Storage Tank at the Callaghan Facility Project
More...
05-0113
10/4/05
Culebra Well No.2 Test Pumping Project
More...
01-8630-203
9/20/05
Oliver Ranch Facility Expansion Project
More...
05-0108
8/30/05
Rehabilitation of the 1.0 MG Water Storage Tank at the Callaghan Facility Project
More...
05-0109
8/30/05
Rehabilitation of the 3.0 MG Hills Reservoir and Two (2) 5,000 Gallon Hydropneumatic Tank Projects
More...
05-5007
8/25/05
Dumbarton from Military to Copinsay Water Replacement Project
More...
05-5005
8/25/05
Eureka from Goliad to Dead End Water Replacement Project
More...
05-5006 & 05-5506
8/25/05
Lula Mae from W.W. White to Eddie Water & Sewer Replacement Project
More...
04-2504
8/24/05
Sanitary Sewer Infrastructure for South Suppliers of the Toyota Manufacturing Facility Project
More...
05-1123
8/23/05
Sunset Station 24” Oversize Border Water Main Project
More...
04-6702
8/16/05
Dos Rios Water Recycling Center Administration and Operations & Maintenance Buildings Roof Repair & HVAC Project
More...
05-3001
8/1/05
Stillwater Ranch Project
More...
05-0107
7/29/05
Leon Creek & Dos Rios WRC Paint/Coating Project
More...
99-3524
7/29/05
Pecan Grove Blvd. Sanitary Sewer Rehabilitation Project
More...
05-8611-215
7/28/05
Carrizo Aquifer Storage and Recovery Integration Program Phase II, Seale Pump Station 3.0 MG Tank
More...
02-3504
7/28/05
Olmos Sanitary Sewer Outfall Relay Project
More...
03-8604-215
7/26/05
Carrizo Aquifer Storage and Recovery Integration Project, Randolph & Seale Pumping Station Improvements
More...
05-1122 & 05-3003
7/26/05
Alamo Ranch Oversize Approach Main & On-Site Oversize Water Mains
More...
05-7505
7/26/05
Condensation Line and Steam Valve Replacement Project
More...
05-1094 and 05-3002
7/21/05
Stillwater Ranch Project
More...
04-1704
7/20/05
Medio Creek Oversize Sanitary Sewer Extension for Potranco Subdivision
More...
05-3004 & 05-1123
7/19/05
Sunset Station 24” Oversize & 30” Oversize Approach & 24” Oversize Border Water Main Project
More...
05-3503
7/1/05
Annual 2005 Cured-In-Place Pipe Work Order Construction Contract
More...
04-7702
6/30/05
San Antonio Water System Interior Remodeling Project
More...
05-8608-207
6/29/05
Gonzales County Carrizo-Buckhorn Wellfield Access & Well Construction PROJECT CANCELLED
More...
03-8518-207
6/29/05
Gonzales County Carrizo-Buckhorn Wellfield Access & Well Construction PROJECT CANCELLED
More...
02-3504
6/28/05
Olmos Sanitary Sewer Outfall Relay Project
More...
05-5001 & 05-5501
6/21/05
Comal Street / Union Pacific Railroad Project
More...
01-7005
6/9/05
Maltsberger North 30-inch Water Transmission Main Project
More...
03-8604-215
6/2/05
Carrizo Aquifer Storage and Recovery Integration Project, Randolph & Seale Pumping Station Improvements
More...
05-0106
5/26/05
2005 Large Diameter Sanitary Sewer Cleaning and Inspection Contract
More...
05-4506
5/24/05
Pecan Valley Dr. – “F” St. to “G” St. and “J” St. to Rigsby Ave. Sanitary Sewer Project
More...
99-2509
4/19/05
Espada Unsewered Area Sanitary Sewer Project
More...
02-4006
4/7/05
Brooks 16-inch Service Main Relocation Project
More...
05-3501
3/31/05
Annual 2005 Pipe Bursting Work Order Construction Contract
More...
04-6505
3/29/05
Dos Rios Water Recycling Center Flow Equalization Basin Improvements Project – Phase 2
More...
00-5531
3/22/05
Pecan Valley Aerial Crossing Enhancement Project
More...
05-0105
3/11/05
Saline Water Study
More...
04-6702
3/8/05
Dos Rios Water Recycling Center, Administration and Operations & Maintenance Buildings Project
More...
99-3530 & 03-4003
3/1/05
Gevers St. at Martin Luther King Dr. Sanitary Sewer Rehabilitation and Water Replacement Project
More...
. 03-8605-215
3/1/05
Carrizo Aquifer Storage and Recovery Integration Project, Transmission Pipeline Segment 6
More...
03-7002
2/22/05
Blanco To Errol 24” Water Transmission Main Project
More...
01-4509
2/8/05
Western Watershed Relief Line (W-Extension-A) Project, Phase III Lines B, C, D, and E
More...
03-6510
2/1/05
Environmental Laboratory Facility Project
More...
00-8111
1/25/05
Winwood 2.0 Million Gallon Ground Storage Tank and Pump Station Project
More...
N/A
1/17/05
The sale of the unimproved San Antonio Water System (SAWS) owned surplus property. This sale will be conducted under section 272.01 Texas Local Governement Code.
More...
05-0101
1/11/05
Annual 2005 Concrete Placement Work Order Construction Contract
More...
03-3006
1/11/05
21455 I.H. 10 WEST Project
More...
N/A
12/21/04
LEON CREEK WRC Clarifier Sandblasting and Coating Project
More...
N/A
12/21/04
DOS RIOS WRC Clarifier Sandblasting and Coating Project
More...
04-4503
12/16/04
Edwards Aquifer Rehabilitation Program.
More...
04-4509
12/16/04
Edwards Aquifer Rehabilitation Program
More...
04-4507
12/16/04
Edwards Aquifer Rehabilitation Program
More...
04-5028 & 04-5528
11/30/04
Donaldson Terrace Area Phase II-B Project
More...
99-6018
11/30/04
Southeast Loop 410 Project, Phase C from South Presa Street to Salado Creek Project
More...
03-6004
11/19/04
Micron Pump Station Phase II Project
More...
04-6705
11/18/04
Dos Rios Water Recycling Center Concrete Expansion Joint Project
More...
04-4505
11/16/04
Edwards Aquifer Rehabilitation Program
More...
04-4508
11/16/04
Edwards Aquifer Rehabilitation Program
More...
03-6514
11/2/04
Salado Creek WRC Distributed Control System Plant Interconnect Project.
More...
04-5042
11/2/04
Applewhite: Zarzarmora to Watson, Environmental Repsonse Support Services
More...
03-6308 & 03-6306
10/28/04
Rehabilitation of the two-0.50 MG and one-0.05 MG Water Storage Tanks at the Turtle Creek No. 2 and Dominion Facilities Project.
More...
01-7005
10/26/04
Maltsberger North 30-inch Water Transmission Main Project
More...
04-6712
10/21/04
Water Recycling Center at Leon Creek & Dos Rios, SPCC Concrete Containment Project.
More...
99-3554
10/21/04
Mountainclimb Lift Station Relocation Project
More...
03-8611-206
10/19/04
Carrizo Aquifer Storage and Recovery Project
More...
04-2503,04-6001 & 04-8618
10/15/04
San Antonio Water System Parking Garage Addition Project
More...
03-7002
10/14/04
Blanco To Errol 24” Water Transmission Main Project
More...
02-3503
10/14/04
Lullwood Ave. Sanitary Sewer Reroute Project.
More...
N/A
10/12/04
Medio Creek WRC Clarifier Sandblasting and Coating Project
More...
04-1111(Border) & 04-3003(Approach)
10/12/04
Silver Oaks 36” and 42” Oversize (12” Required) Approach and Border Main Project
More...
03-3703W,03-6523WW & 04-8617Recycle
10/7/04
Water, Wastewater and Recycle Infrastructure for Toyota Manufacturing Facility Project.
More...
04-4504
9/28/04
Edwards Aquifer Recharge Zone Point Repairs Package 1
More...
04-4502
9/28/04
Edwards Aquifer Recharge Zone Open Cut Ph-2
More...
94-4514 & 99-4516
9/21/04
Fairlawn Outfall/Goliad Rd.- Palfrey Dr. to Linn Rd.
More...
04-5036/04-5536
9/21/04
Donaldson Terrace Area – Cheryl Drive : Donaldson to Senisa Project
More...
03-6307
9/14/04
Rehabilitation of the 1.5 MG Water Storage Tank at the Austin Facility.
More...
03-6511
9/1/04
Castroville Road/ S.W. 38th Street Lift Station and Force Main Project.
More...
99-8024 & 03-7003
8/19/04
Interbranch Connection Segment 2 & 3 Water Recycling Program & Jackson-Keller to Oblate Water Main Project
More...
04-1633
8/17/04
Far West Area Private Participation Group Potranca Creek Outfall
More...
04-5013 & 04-5513
8/16/04
Donaldson Terrace Area Phase II-A Project
More...
03-8620
8/12/04
World Savings 24” Recycle Main Extension Project
More...
04-5001/04-5501
8/9/04
Guadalupe Street, IH 35 to Flores
More...
02-5020/02-5520
7/8/04
Sadie – Presa to Labor; Sadie – Labor to IH-37 and Vance – Presa to Labor; Water and Sewer System Improvement Project
More...
04-5006/04-5506
7/8/04
Paso Hondo St.: New Braunfels to N. Gevers St. and Live Oak St.: E. Houston St. to E. Crockett St.; for the 2004/2005 City Street Overlay/Maintenance Water & Sewer Replacement Projects.
More...
04-5004 & 04-5504
6/29/04
Ellor and Maria Elena Project
More...
01-7002
6/28/04
20” Water Main, UTSA Boulevard Project
More...
03-6511
6/24/04
Castroville Road/ S.W. 38th Street Lift Station and Force Main Project
More...
04-5005/04-5505 & CPS 3268226
6/21/04
Carolina: Presa to IH 37; Delaware: Labor to IH 37
More...
04-0101
6/18/04
Saline Study Monitor Well Drilling
More...
02-5018 & 02-5518
5/28/04
Ruiz Street -21st to 34th – Water and Sewer System Improvements Project
More...
04-1510
5/27/04
Boerne Stage Road Sewer Participation Group Sanitary Sewer Extension
More...
04-4501
5/20/04
Edwards Aquifer Rehabilitation Program
More...
04-4502
5/20/04
Edwards Aquifer Rehabilitation Program
More...
04-4503
5/20/04
Edwards Aquifer Rehabilitation Program
More...
04-4504
5/20/04
Edwards Aquifer Rehabilitation Program
More...
04-4505
5/20/04
Edwards Aquifer Rehabilitation Program
More...
04-4506
5/20/04
Edwards Aquifer Recharge Zone CIPP Sanitary Sewer Replacements and Improvements Project.
More...
04-4508
5/20/04
Edwards Aquifer Rehabilitation Program
More...
04-4509
5/20/04
Edwards Aquifer Rehabilitation Program
More...
02-5016/02-5516 & 02-5017/02-5517
5/18/04
Boerne-Carolina to Devine, Eager-Presa to Devine,and Hemphill -Benrus to Broadview - Water and Sewer System Improvements Project
More...
02-7003
5/6/04
Weybridge: Dover Ridge to Loop 1604 Project
More...
03-7509
5/4/04
Steam Return Line Replacement @ Alamo Street & Nueva Street Project
More...
04-8602-206
4/20/04
South Bexar Aquifer Storage and Recovery Large Capacity Water Well Project
More...
04-8603-206
4/20/04
South Bexar Aquifer Storage Large Capacity Water Well Diagnostics & Pump Service Project
More...
04-8604-206
4/20/04
South Bexar Aquifer Storage and Recovery Small Capacity Water Well Construction Project
More...
04-8605-206
4/20/04
South Bexar Aquifer Storage and Recovery Small Capacity Water Well Diagnostics and Pump Service Project
More...
04-0100
4/16/04
Annual 2004 Asphalt Overlay Work Order Construction Contract
More...
04-7501
3/15/04
Central Plant Boiler Reconstruction
More...
98-6021
2/26/04
Loop 1604:Blanco Rd. to Sigma Dr. Water Main Project, Phase II
More...
03-5022
2/18/04
Crockett Street Railroad Bore Project
More...
01-6005
2/13/04
County Line Temporary Booster Station and Tank Project
More...
04-8602-206
2/12/04
South Bexar County Aquifer Storage and Recovery Project, Large Capacity Water Well Drilling
More...
04-8603-206
2/12/04
South Bexar County Aquifer Storage and Recovery Project, Large Capacity Water Well Diagnostics & Pump Service
More...
04-8604-206
2/11/04
South Bexar County Aquifer Storage & Recovery Project, Small Capacity Water Well Construction
More...
04-8605-206
2/11/04
South Bexar County Aquifer Storage & Recovery Project, Small Capacity Water Well Diagnostics & Pump Service
More...
Conservation Dept
1/6/04
Landscape Demonstration Garden
More...
02-6506
12/16/03
San Antonio Ranch WRC Elimination Project
More...
99-6004
12/5/03
North East Loop 410 Water Main Extension Project
More...
01-8624
12/2/03
Winwood Tank/I.H.10 Water Main Project
More...
00-8141
11/25/03
San Fernando Water Company Upgrade, Phase I Project
More...
03-3505
11/24/03
Leon Creek Long Term Monitoring Network Project
More...
02-6516
11/21/03
Medina River Bank Stabilization at the Dos Rios Water Recycling Center Project
More...
03-5005
11/18/03
Hildebrand Avenue 20-Inch Water Main Adjustment Project
More...
02-7002
11/14/03
Robinhood: Nacogdoches to New Braunfels Project
More...
02-6520
11/13/03
Dos Rios Water Recycling Center Digester Rehabilitation and Modifications Project, Phases 3 and 4
More...
03-5014 & 03-5511
10/23/03
Donaldson Terrace- Phase I Water & Sewer System Improvement Project
More...
02-4007
10/16/03
Brooks City-Base, Texas Project
More...
02-6001
10/15/03
Culebra Pump Station Drill Deep Well No. 2 Project
More...
03-7005
10/7/03
Encino Royale: Encino Rio to Encino Cliff Project
More...
02-6018-003 & 02-6018-004
9/23/03
Rehabilitation of the 0.50 and 0.033 MG Water Storage Tank at the Encino Park and Cedar Creek Station Project
More...
02-6018-001 & 02-6018-002
9/23/03
Rehabilitation of the 5.0 and 0.27 MG Water Storage Tank at the Marbach and Helotes Park No. 3 Station Project
More...
03-8612
9/17/03
SAWS Facility Landscaping Project
More...
94-4513
8/12/03
Meadow Village West Sanitary Sewer Replacement Project
More...
03-3507
7/31/03
Annual 2003 Pipe Bursting Work Order Construction Contract
More...
03-3506
7/29/03
Annual 2003 Cured-In-Place Pipe Work Order Construciton Contract
More...
03-3001
7/17/03
5911 & 6005 Camp Bullis Water Main Extension
More...
02-3004 and 03-3005
7/15/03
Water Main Extension Projects I-2003
More...
01-7004
7/9/03
Marshall/Bulverde to Marshall/Evans Reservoir
More...
03-1599
7/2/03
IH-10 Participation Group Off-Site Sanitary Sewer Replacement
More...
01-4508
7/1/03
Western Watershed Line (-Extension-A) Project
More...
03-0101
6/5/03
Annual 2003 Concrete Placement Job Order Construction Contract
More...
02-5510
4/10/03
Mockert Area Streets Sanitary Sewer Rehabilitation Project
More...
01-0001
3/25/03
Helotes Ranch Acres Pressure Reducing Valve Installation Project
More...
01-8622
3/21/03
BSR Well Nos. 3 and 4 Mains and Pumping Facilities Project
More...
02-7006
3/13/03
Braun Road Project
More...
02-5528
3/6/03
Southside Independent School District - Wastewater Consolidation System
More...
02-0100
1/28/03
Annual Asphalt Recyling and Overlay Construction Contract
More...
02-0011
1/21/03
9865 Tower View Water Main Extension Project
More...
02-3003
1/7/03
Menn Tract 36-inch Oversize Approach Water Main Project
More...
02-6008
12/9/02
the Grissom Road Tank Project
More...
01-7003
12/5/02
Potranco and SH 151 Water Transmission Main Project
More...
02-8607-207
12/4/02
Gonzales County Monitoring Well Drilling Project
More...
02-6004
12/3/02
Fawn Standpipe and University Hills Pump Station Project
More...
99-8011
11/19/02
the Dos Rios Recycled Water Pump Station
More...
02-6515
10/21/02
Leon Creek, Salado Creek, and Dos Rios Water Recycling Centers Interconnections Modifications Part B
More...
02-3002
10/16/02
Springs at Boerne Stage 20-inch Oversize Approach Main Water Distribution System Project
More...
02-6510
10/10/02
Dos Rios Water Recycling Center Groundwater Protection and Monitoring Project
More...
01-6514
10/8/02
Mitchell Lake Wetlands-House, Amenities, and Dike Repair Project
More...
02-7504
10/2/02
Central Plant Heating and Cooling Upgrades Project
More...
02-3506
9/12/02
Wagner avenue Sanitary Sewer Replacement Project
More...
00-7006
9/6/02
5.0MG Water Storage Tank at the Helotes Station Project
More...
00-7005 & 00-7009
9/5/02
5.0 and .55MG Water Storage Tank at the Bitters and Marshall Station Project
More...
99-4514
8/21/02
Sanitary Sewer Outfall Siphons, siphons 1 and 2
More...
00-7008
8/20/02
0.8 MG Water Storage Tank at the Market Station Project
More...
98-6509
7/18/02
Salado Creek and Dos Rios WRC Interconnection Lines
More...
00-8141
7/12/02
San Fernando Water Company Upgrade Phase I Project
More...
01-3001
7/10/02
Alamo Farmsteads Subdivision, (Approach Main) and (Border Main)
More...
02-1039
7/9/02
Dr. Joe Ward Elementary School Project
More...
99-4003 and 99-4504
7/8/02
Golden Valley Water and Sewer Replacement Project
More...
02-6508
7/3/02
Dos Rios Water Recycling Center HVAC Upgrade Project
More...
02-1045
7/2/02
Shavano Park, Unit-19, 20-inch Oversize Border Water Line Extension Project
More...
02-7504
6/28/02
Central Plant Heating and Cooling Upgrades Project
More...
01-8608-206A
6/25/02
Carrizo Aquifer Storage and Recovery Program
More...
01-8609-206
6/20/02
Aquifer Storage and Recovery Project, Transmission Pipeline Segment II
More...
01-8610-206
6/19/02
Carrizo ASR Program, ASR Water Transmission Pipeline Design 2B Project
More...
99-4517
6/11/02
West Salado Creek Outfall Lift Station Elimination Project, Phase II
More...
01-8618-215
6/7/02
Aquifer Storage and Recovery Program, Segment III Project
More...
01-8619-215
6/6/02
ASR Integration Program, Transmission Main Segment IV
More...
01-8620-215
6/6/02
ASR Integration Program Artesia and Seale Pumping Station Improvements
More...
01-8607-206 and 01-8611-206
6/4/02
Carrizo Aquifer Storage and Recovery Program, Treatment Plant and High Service Pump Station
More...

Click here for bid results prior to May 30, 2002.

image  
 

© 2009 San Antonio Water System • 2800 U.S. Hwy 281 North • P.O. Box 2449 • San Antonio, TX 78298-2449
210.704.7297

Customer service inquiries: service@saws.org. Web site issues: webmaster@saws.org.