Aquifer Beaker

Edwards Aquifer

Aquifer Level 629.5'
10/29/14 - Official

The Edwards aquifer and its catchment area in the San Antonio region is about 8,000 square miles and includes all or part of 13 counties in south-central Texas.

Learn More »


Landscape Watering
Last Digit of Address Watering Day
0 or 1 Monday
2 or 3 Tuesday
4 or 5 Wednesday
6 or 7 Thursday
8 or 9 Friday
No Watering on Weekends

Stage 2:
Water On Your Day

Watering with an irrigation system or sprinkler is allowed only once a week from 7-11 a.m. and 7-11 p.m. on your designated watering day as determined by your address.

Learn More »


Close

Aquifer Level 629.5 | Stage 2: Water On Your Day

Login

Pay Your Bill Online

Username Password  
Forgot Your Password?  

New User

Register for SAWS eBill

Don't Have An Account? Get Started Now.

Sign Up Now


Close
Contract Solicitations

San Antonio Water System

Solicitation No. B-12-052-MF

Seale Ground Storage Tank No. 1 Painting and Rehabilitation Project
Due Date: 2:00 PM Friday, 9/14/12   Estimated Cost: $1,874,000.00
Status: Selection Approved and Awarded   Awarded:
         

 

INVITATION FOR COMPETITIVE SEALED PROPOSALS
 
Solicitation No.  B-12-052-MF
 
Sealed proposals are requested by the San Antonio Water System for the Seale Ground Storage Tank No. 1 Painting and Rehabilitation Project, SAWS Job No. 11-0107. The project includes, but is not limited to, the following:
 
Rehabilitation of a 3,000,000 gallon welded steel, ground storage tank, including the surface preparation and repainting of the interior and exterior surfaces; replacement of specified tank appurtenances; surface preparation and painting of three well pump and piping assemblies; surface preparation and painting of five (5) high service pump assemblies; replacement of five flow meters and two check valves; replacement of two concrete vaults and one new concrete vault; site paving and sidewalk improvements; site fencing improvements; a new shade canopy; electrical equipment improvements; and other miscellaneous work.  
 
To view additional project information, as well as obtain the plans and specifications for this project, visit our website located at www.saws.org and click on the Business Center. Then select Bidder, Consultant, and Vendor Registration, which is located on the left-hand side of the screen. Select the Register Now button and proceed with registration. For difficulties downloading plans and specifications, contact the Contracting Department at 210-233-3405.
 
For questions regarding this solicitation, technical questions or additional information, please contact Maria Franco, Contractor Administrator, in writing via email to: mfranco@saws.org by fax to (210) 233-4622 until 4:00 PM (CST) on September 7, 2012. Answers to the questions will be posted to the web site by 4:00 PM (CST) on September 11, 2012 as a separate document or included as part of an addendum.
 
 
A Mandatory Pre-Proposal Meeting will be held at September 5, 2012 at 10:00 a.m. at the San Antonio Water System’s Customer Service Building, 4th floor, Conference Room 452, 2800 U.S. Hwy 281 North, San Antonio, Texas. Please be advised that under no circumstances shall any late or non-attendee(s) to the Mandatory Pre-Proposal Meeting be allowed to submit a competitive sealed proposal for the project. Immediately following the pre-proposal meeting there will be a MANDATORY site visit. 
 
Sealed proposals will be received by the Contract Administration Division, 2800 U.S. Hwy 281 North, Customer Center Building, Suite 171, San Antonio, Texas 78212, until September 14, 2012 at 2:00 p.m. Proposals will then be publicly opened and read aloud in Contract Administration, Suite 169, Customer Center Building, 2800 U.S. Hwy 281 North, San Antonio, Texas. This solicitation requires a Qualification Package, Good Faith Effort Plan, and Conflict of Interest Questionnaire, which should be included as part of the proposals and will become part of the construction documents.  Each proposal must be accompanied by a cashier's check, certified check, or bid bond in an amount not less than five percent of the total price proposal.

Mandatory Pre-Submittal Meeting
10:00 AM, Wednesday Sep. 5, 2012
San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; Conference Room C-452

Download
Full RFCSP Proposal
File Type: pdf
Note: You will be prompted to login to access the full proposal document.
Mandatory Pre-Proposal Sign In
Sep 5, 2012
File Type: pdf
Awarded Firm Information
Nov 6, 2012
File Type: pdf
Addendum 2
Sep 11, 2012
File Type: pdf
Addendum 1
Sep 6, 2012
File Type: pdf
Specifications
Aug 21, 2012
File Type: pdf
Note: You will be prompted to login to access this document.
Plans
Aug 21, 2012
File Type: pdf
Note: You will be prompted to login to access this document.
Need the free Adobe® Reader® for PDF files? Click here.

Interested Firm List
Click here to view firms who have obtained the proposal for this RFCSP.