The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.
|
Solicitation No.
|
Type
|
Job No.
|
Close Date
|
Project Name
|
Details
|
|
B-12-008-DD
|
IFB
|
12-5006 & 12-5506
|
2/10/12
|
2012 Water & Sewer Alley Construction Contract, Package II
|
View Results PDF
|
|
|
|
B-12-007-DD
|
IFB
|
12-5005 & 12-5505
|
2/10/12
|
2012 Water and Sewer Alley Construction Contract, Package I
|
View Results PDF
|
|
|
|
B-12-006-DD
|
IFB
|
12-5004 & 12-5504
|
2/10/12
|
2012 Water and Sewer Construction Contract, Package IV
|
View Results PDF
|
|
|
|
B-12-005-DD
|
IFB
|
12-5003 & 12-5503
|
2/9/12
|
2012 Water & Sewer Construction Contract, Package III
|
View Results PDF
|
|
|
|
B-12-013-MR
|
IFB
|
12-0101
|
2/7/12
|
ANNUAL 2012 ASPHALT OVERLAY WORK ORDER CONSTRUCTION CONTRACT
|
View Results PDF
|
|
|
|
B-12-016-MF
|
IFB
|
12-2514
|
2/7/12
|
2012 Rehabilitation Work Order Construction Contract
|
View Results PDF
|
|
|
|
B-11-063-RA
|
IFB
|
10-7004
|
2/6/12
|
Forest Crest Water Local Benefit Main
|
View Results PDF
|
|
|
|
B-12-010-CM
|
IFB
|
08-2512
|
2/2/12
|
Olmos Basin Central Watershed Sanitary Sewer Relief Main (C-3) Reaches 1 to 4 Project
|
View Results PDF
|
|
|
|
B-11-050-MF
|
IFB
|
10-6501
|
1/30/12
|
Leon Creek Water Recycling Center (WRC) Interconnect to the Southwest Bexar Sewer Pipeline (SBSP) Project
|
View Results PDF
|
|
|
|
B-11-062-CM
|
IFB
|
12-6503
|
1/18/12
|
Dos Rios WRC Sludge Loading Building Permanent Stabilization
|
View Results PDF
|
|
|
|
B-11-030-DD
|
IFB
|
12-2505
|
1/12/12
|
Medina River Sewer Outfall - Segment 5
|
View Results PDF
|
|
|
|
B-11-058-CM
|
IFB
|
11-1064
|
1/11/12
|
Quiet Creek 16" Oversize (8" Required) Water Main Phase 1
|
View Results PDF
|
|
|
|
B-11-059-CM
|
IFB
|
10-1528 & 10-1529
|
1/10/12
|
Verano Phase 2 Sanitary Sewer Lines "A1" & "B"(10-1528) & Verano Phase 2 Lift Station #1 & 10-inch Force Main (10-1529)
|
View Results PDF
|
|
|
|
B-11-029-DD
|
IFB
|
12-2504
|
1/5/12
|
Medina River Sewer Outfall - Segment 4
|
View Results PDF
|
|
|
|
B-11-047-MF
|
IFB
|
08-2504
|
11/8/11
|
Lift Stations Rehabilitation, Phase 3
|
View Results PDF
|
|
|
|
B-11-051-CM
|
IFB
|
08-2512
|
11/4/11
|
Olmos Basin Central Watershed Sewer Relief Main (C-3)
|
View Results PDF
|
|
|
|
B-11-054-RA
|
IFB
|
10-4002
|
11/1/11
|
FM 78 12-inch Water Line from Woodlake Drive to Congressional Boulevard
|
View Results PDF
|
|
|
|
B-11-028-DD
|
IFB
|
11-2504
|
10/18/11
|
Medina River Sewer Outfall - Segment 3
|
View Results PDF
|
|
|
|
B-11-052-RA
|
IFB
|
09-2501
|
10/10/11
|
Far West Sewer Relief Main (FW-01) Project
|
View Results PDF
|
|
|
|
B-11-055-CM
|
IFB
|
11-6003
|
10/10/11
|
Perimeter Fence at Turtle Creek #3
|
View Results PDF
|
|
|
|
B-11-043-DD
|
IFB
|
11-4003
|
9/30/11
|
Annual 2011 Open Cut Water Work Order Construction Contract Project
|
View Results PDF
|
|
|
|
B-11-044-DD
|
IFB
|
11-4512
|
9/16/11
|
Annual 2011 Open Cut Sewer Work Order Construction Contract
|
View Results PDF
|
|
|
|
B-11-045-DG
|
IFB
|
10-7002
|
9/14/11
|
48-Inch Water Main - Micron to Anderson Tank Phase II Project
|
View Results PDF
|
|
|
|
B-11-049-CM
|
IFB
|
11-0111 & 11-1402
|
9/13/11
|
2011 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Package 2
|
View Results PDF
|
|
|
|
11-048-CM
|
IFB
|
11-0110
|
9/13/11
|
Annual 2011 Sanitary Sewer Main Point Repair and Manhole Adjustments Package 1 Project
|
View Results PDF
|
|
|
|
B-11-027-CM
|
IFB
|
11-6004
|
9/9/11
|
Leon Creek Communications Tower
|
View Results PDF
|
|
|
|
B-11-041-RA
|
IFB
|
11-5019 & 11-5519
|
9/7/11
|
2011 SAWS Water and Sewer Construction Contract Package VIII
|
View Results PDF
|
|
|
|
B-11-040-RA
|
IFB
|
11-5018 & 11-5518
|
9/6/11
|
2011 SAWS Water and Sewer Construction Contract Package VII
|
View Results PDF
|
|
|
|
B-11-039-RA
|
IFB
|
11-5017 & 11-5517
|
9/6/11
|
2011 Water & Sewer Construction Package VI Project
|
View Results PDF
|
|
|
|
B-11-034-CM
|
IFB
|
11-0113 & 11-1402
|
8/9/11
|
2011 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Construction Contract Package 4
|
View Results PDF
|
|
|
|
B-11-033-CM
|
IFB
|
11-0112 & 11-1402
|
8/9/11
|
2011 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Construction Contract Package 3
|
View Results PDF
|
|
|
|
B-11-032-CM
|
IFB
|
11-0111 & 11-1402
|
8/9/11
|
2011 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Construction Contract Package 2
|
View Results PDF
|
|
|
|
B-11-031-CM
|
IFB
|
11-0110 & 11-1402
|
8/9/11
|
2011 Annual Sanitary Sewer Main Point Repair & Manhole Adjustments Construction Contract Package 1
|
View Results PDF
|
|
|
|
B-11-024-MF
|
IFB
|
03-8518-207
|
6/22/11
|
Regional Carrizo, Buckhorn Well Field
|
View Results PDF
|
|
|
|
B-11-025-CM
|
IFB
|
11-0106
|
6/15/11
|
Dos Rios Tower
|
View Results PDF
|
|
|
|
B-11-023-DD
|
IFB
|
11-2517
|
5/20/11
|
2011 Rehabilitation Work Order Construction Contract 2
|
View Results PDF
|
|
|
|
B-11-020-DG
|
IFB
|
11-4514
|
5/12/11
|
South Presa Street 48" Siphon #6 Project
|
View Results PDF
|
|
|
|
B-11-002-DD
|
IFB
|
07-6007
|
5/6/11
|
Anderson Pump Station Improvements Project
|
View Results PDF
|
|
|
|
B-11-017-RA
|
IFB
|
11-0104 & 11-1401
|
4/7/11
|
2011 Annual Water Distribution Leak Repairs Contract - Package 2
|
View Results PDF
|
|
|
|
B-11-016-RA
|
IFB
|
11-0103 & 11-1401
|
4/7/11
|
2011 Annual Water Distribution Leak Repairs Contract - Package 1
|
View Results PDF
|
|
|
|
B-11-013-DD
|
IFB
|
11-5007 & 11-5507
|
3/30/11
|
2011 Water & Sewer Construction, Package V
|
View Results PDF
|
|
|
|
B-11-012-DD
|
IFB
|
11-5006 & 11-5506
|
3/29/11
|
2011 Water & Sewer Construction, Package IV
|
View Results PDF
|
|
|
|
B-11-011-DD
|
IFB
|
11-5005 & 11-5505
|
3/29/11
|
2011 Water & Sewer Construction Package, Package III
|
View Results PDF
|
|
|
|
B-11-003-RA
|
IFB
|
10-8624-202
|
3/11/11
|
Pinn Rd Recycled Water Pump Station Improvements Project
|
View Results PDF
|
|
|
|
B-11-010-RA
|
IFB
|
11-0104 & 11-1401
|
2/22/11
|
2011 Annual Water Distribution Leak Repairs Contract – Package 2
|
View Results PDF
|
|
|
|
B-11-009-RA
|
IFB
|
11-0103 & 11-1401
|
2/22/11
|
2011 Annual Water Distribution Leak Repairs Contract – Package 1
|
View Results PDF
|
|
|
|
B-11-007-RA
|
IFB
|
10-8625-218
|
2/22/11
|
Fence Construction: Nelson, Baker and Pattillo Tracts
|
View Results PDF
|
|
|
|
B-11-008-MR
|
IFB
|
07-3004
|
2/10/11
|
Borgfeld Road – West, 16-Inch Oversized Water Project
|
View Results PDF
|
|
|
|
B-11-001-DD
|
IFB
|
08-6505
|
1/31/11
|
Install Digester Gas Flowmeters Dos Rios WRC
|
View Results PDF
|
|
|
|
B-11-006-RA
|
IFB
|
11-0101
|
1/28/11
|
Annual 2011 Asphalt Overlay Work Order Construction Contract Project
|
View Results PDF
|
|
|
|
B-10-057-DD
|
IFB
|
08-6502
|
12/17/10
|
Dos Rios Water Recycling Center (WRC) Re-Rating Headworks Improvements and Process Enhancements, Phase I Project
|
View Results PDF
|
|
|
|
B-10-055-DD
|
IFB
|
11-2503
|
12/14/10
|
Medina River Sewer Outfall - Segment 2
|
View Results PDF
|
|
|
|
B-10-060-CM
|
IFB
|
10-5124 & 10-5624
|
11/18/10
|
2011 Water and Sewer Construction Package II
|
View Results PDF
|
|
|
|
B-10-059-CM
|
IFB
|
10-5123 & 10-5623
|
11/18/10
|
2011 Water and Sewer Construction Package 1 Project
|
View Results PDF
|
|
|
|
B-10-058-CM
|
IFB
|
10-1025
|
11/4/10
|
Anderson Tract 16-inch Oversize (12-Inch Required) Water Mian Project
|
View Results PDF
|
|
|
|
B-10-044-CM
|
IFB
|
10-4001
|
10/29/10
|
2010 Open Cut Water Work Order Construction Contract
|
View Results PDF
|
|
|
|
B-10-048-DD
|
IFB
|
06-2503
|
10/28/10
|
Lift Stations Rehabilitation – Phase 2 Project
|
View Results PDF
|
|
|
|
B-10-050-DD
|
IFB
|
07-7003
|
10/19/10
|
Water Transmission Main – Rogers Ranch to I.H. 10 Project
|
View Results PDF
|
|
|
|
B-10-052-MR
|
IFB
|
07-3008
|
10/12/10
|
Borgfeld Road – East, 16-Inch and 24-Inch Oversize (12-Inch Required) Water Main Project
|
View Results PDF
|
|
|
|
B-10-056-DG
|
IFB
|
09-6005
|
10/6/10
|
Pressure Reducing Valve (PRV) Flow Monitoring and Pressure Monitoring Project
|
View Results PDF
|
|
|
|
B-10-053-MR
|
IFB
|
07-6006-113
|
10/5/10
|
Cross Mountain Elevated Storage Tank Project
|
View Results PDF
|
|
|
|
B-10-051-RA
|
IFB
|
07-1693
|
9/21/10
|
Masterson Road 36-Inch Oversize (15-Inch Required) Sanitary Sewer Project
|
View Results PDF
|
|
|
|
B-10-046-RA
|
IFB
|
10-2507
|
9/17/10
|
Western Watershed Sewer Relief Line - Hwy. 90 to S.W. Loop 410 Project (Upper Segment) Morey Road Siphon Construction
|
View Results PDF
|
|
|
|
B-10-043-CM
|
IFB
|
08-4515
|
9/14/10
|
Helotes Creek Erosion Repairs
|
View Results PDF
|
|
|
|
B-10-049-CM
|
IFB
|
10-4521
|
8/27/10
|
2010 Rehabilitation Work Order Construction Contract
|
View Results PDF
|
|
|
|
B-10-034-DD
|
IFB
|
10-2502
|
8/18/10
|
Medina River Sewer Outfall, Segment 6
|
View Results PDF
|
|
|
|
B-10-038-RA
|
IFB
|
10-6503
|
8/13/10
|
Medio Creek WRC Carousels 4 & 5 Bridges Replacement Project
|
View Results PDF
|
|
|
|
B-10-033-DD
|
IFB
|
10-2501
|
8/13/10
|
Medina River Sewer Outfall, Segment 1
|
View Results PDF
|
|
|
|
B-10-031-MF
|
IFB
|
07-6500
|
8/13/10
|
Dos Rios WRC Digester Mixing & System Enhancements, Ph I
|
View Results PDF
|
|
|
|
B-10-045-DD
|
IFB
|
10-4512
|
8/11/10
|
Annual 2010 Open Cut Sewer Work Order Construction Contract
|
View Results PDF
|
|
|
|
B-10-036-DD
|
IFB
|
09-8605
|
7/16/10
|
Recycled Water Interconnect Flow Control Valve
|
View Results PDF
|
|
|
|
B-10-039-DD
|
IFB
|
10-1526 and 10-1527
|
7/14/10
|
Verano Phase I Sanitary Sewer Project
|
View Results PDF
|
|
|
|
B-10-027-RA
|
IFB
|
10-7703
|
7/1/10
|
North East Service Center Storage Bins Project
|
View Results PDF
|
|
|
|
B-10-037-DG
|
IFB
|
09-7008
|
6/17/10
|
S & S Hills Subdivision 12-inch Waterline Extension Project
|
View Results PDF
|
|
|
|
B-10-029-RA
|
IFB
|
09-7008
|
5/13/10
|
S&S Hills Subdivision 12-inch Water Line Extension
|
View Results PDF
|
|
|
|
B-10-023-RA
|
IFB
|
09-1006
|
5/6/10
|
Western Development 24-inch Oversized (12-inch Required) Water Main
|
View Results PDF
|
|
|
|
B-10-024-DG
|
IFB
|
09-2524
|
5/3/10
|
Elimination of Lift Station 227 Wilderness Oak Part 2
|
View Results PDF
|
|
|
|
B-10-030-DD
|
IFB
|
10-4518
|
4/22/10
|
2010 Pipe Bursting Work Order Construction Contract - Phase 2 Project
|
View Results PDF
|
|
|
|
B-10-022-CM
|
IFB
|
09-1046
|
3/9/10
|
Traders Village 36-inch Oversize (16-inch Required) Water Main
|
View Results PDF
|
|
|
|
B-10-009-RA
|
IFB
|
09-5075 & 09-5575
|
3/4/10
|
San Antonio River Improvement Historic Mission Reach, Phase IV
|
View Results PDF
|
|
|
|
B-10-021-CM
|
IFB
|
10-8602-206
|
3/4/10
|
Small Capacity Well Mitigation Program
|
View Results PDF
|
|
|
|
B-10-008-RA
|
IFB
|
08-5075 & 08-5575
|
3/2/10
|
Terrell Hills Water & Sanitary Sewer Replacement Project Phase II
|
View Results PDF
|
|
|
|
B-10-013-CM
|
IFB
|
10-5006 & 10-5506
|
2/23/10
|
2010 Water & Sewer Construction Package IV
|
View Results PDF
|
|
|
|
B-10-012-CM
|
IFB
|
10-5005 & 10-5505
|
2/23/10
|
2010 Water & Sewer Construction Package III
|
View Results PDF
|
|
|
|
B-10-011-CM
|
IFB
|
10-5004 & 10-5504
|
2/19/10
|
2010 Water & Sewer Construction Package II
|
View Results PDF
|
|
|
|
B-10-010-CM
|
IFB
|
10-5003 & 10-5503
|
2/19/10
|
2010 Water & Sewer Construction Package I
|
View Results PDF
|
|
|
|
B-09-078-DG
|
IFB
|
07-6009
|
2/10/10
|
Water Production Facility Upgrades Phase III - Mission Pump Station Project.
|
View Results PDF
|
|
|
|
B-10-006-CM
|
IFB
|
10-8603-206
|
2/3/10
|
Large Capacity Well Mitigation Program
|
View Results PDF
|
|
|
|
B-10-005-CM
|
IFB
|
10-8602-206
|
2/3/10
|
Small Capacity Well Mitigation Program ( All Bids Rejected)
|
View Results PDF
|
|
|
|
B-10-007-RA
|
IFB
|
10-4511
|
2/2/10
|
Annual 2010 Pipe Bursting Work Order Construction Contract
|
View Results PDF
|
|
|
|
B-10-004-DD
|
IFB
|
10-0111 &10-1402
|
1/27/10
|
2010 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Construction Contract - Package 4
|
View Results PDF
|
|
|
|
B-10-003-DD
|
IFB
|
10-0110 &10-1402
|
1/27/10
|
2010 Annual Sanitary Sewer Main Point Repair Adjustments Construction Contract - Package 3
|
View Results PDF
|
|
|
|
B-10-001-DD
|
IFB
|
10-0108 & 10-1402
|
1/19/10
|
2010 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Construction Contract - Package 1
|
View Results PDF
|
|
|
|
B-10-002-DD
|
IFB
|
10-0109 & 10-1402
|
1/19/10
|
2010 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Construction Contract - Package 2
|
View Results PDF
|
|
|
|
B-09-075-CM
|
IFB
|
08-4501
|
1/8/10
|
Wastewater Collection System Small Main Repairs at Focus Areas
|
View Results PDF
|
|
|
|
B-09-069-RA
|
IFB
|
09-5115 & 09-5615
|
1/6/10
|
2010 IDC Water & Sewer Construction Package III
|
View Results PDF
|
|
|
|
B-09-077-DD
|
IFB
|
08-4501
|
1/5/10
|
Wastewater Collection System Small Main Rehabilitation at Focus Areas - Pipebursting Method
|
View Results PDF
|
|
|
|
B-09-068-RA
|
IFB
|
09-5114 & 09-5614
|
1/5/10
|
2010 IDC Water and Sewer Construction Package II
|
View Results PDF
|
|
|
|
B-09-067-RA
|
IFB
|
09-5113 & 09-5613
|
1/4/10
|
2010 IDC Water and Sewer Construction Package I
|
View Results PDF
|
|
|
|
B-09-073-RA
|
IFB
|
10-0107
|
12/18/09
|
2010 Concrete Placement Work Order Construction Contract – Package No. 4 Project
|
View Results PDF
|
|
|
|
B-09-072-RA
|
IFB
|
10-0106
|
12/18/09
|
2010 Concrete Placement Work Order Construction Contract – Package No. 3 Project
|
View Results PDF
|
|
|
|
B-09-071-RA
|
IFB
|
10-0105
|
12/16/09
|
2010 Concrete Placement Work Order Construction Contract – Package No. 2 Project
|
View Results PDF
|
|
|
|
B-09-070-RA
|
IFB
|
10-0104
|
12/16/09
|
2010 Concrete Placement Work Order Construction Contract – Package No. 1 Project
|
View Results PDF
|
|
|