SAWS: New Service
Aquifer Beaker

Edwards Aquifer

Aquifer Level 658.2'
5/22/18 - Official

The Edwards aquifer and its catchment area in the San Antonio region is about 8,000 square miles and includes all or part of 13 counties in south-central Texas.

Learn More »


image

Stage 1:
Water once a week

Watering with an irrigation system or sprinkler is allowed only once a week before 11 a.m. or after 7 p.m. on your designated watering day as determined by your address.

Learn More »


Close

Aquifer Level 658.2 | Stage 1: Water once a week

eBill Site Maintenance

4 - 6:00 a.m.

The SAWS eBill site will be unavailable from 4 - 6:00 a.m. due to site maintenance. We apologize for the inconvenience. Please check back soon!


Close
image

New Service

A new service refers to the installation of new water or wastewater installations to water or wastewater mains.

  • Installing a service(s) to a vacant lot with no existing services.
  • Adding an irrigation or fire protection service to a property.
  • Installing a separate service for a duplex, town home, apartment, or other like structures.

Click on the link below to download the New Service application package in Adobe PDF format:

Sewer Permits Outside City Limits and within the Recharge Zone

A permit is required prior to connecting a private service lateral which is located outside the city limits and within the Edwards Recharge Zone to the city's sanitary sewer system. A licensed master plumber must submit a completed application form to the SAWS Resource Compliance and Protection Department. A nonrefundable $40 permit fee must be paid at the time the application is submitted.

Need the free Adobe® Reader® for PDF files? Click here.