SAWS Contractor/Plumbers List
Aquifer Beaker

Edwards Aquifer

Aquifer Level 671.0'
9/19/18 - Official

The Edwards aquifer and its catchment area in the San Antonio region is about 8,000 square miles and includes all or part of 13 counties in south-central Texas.

Learn More »


image

Stage 2:
Water On Your Day

Watering with an irrigation system or sprinkler is allowed only once a week from 7-11 a.m. and 7-11 p.m. on your designated watering day as determined by your address.

Learn More »


Close

Aquifer Level 671.0 | Stage 2: Water On Your Day

Log In

Pay Your Bill Online

Already registered? Log in now.

Forgot your password?

New User

My Account Page

No user account? No problem.

Sign Up Now


Close
image

Contractor/Plumbers List

  Download Application
 

Contractor/Plumber Application

SAWS Standard Insurance Specifications

The contractors/plumbers included in this list, have met the minimum insurance qualifications established by San Antonio Water System and have been authorized to make connections to SAWS' water, reuse, and/or wastewater utilities. It is the responsibility of these contractors/plumbers to keep all insurance current.

SAWS does not endorse any one contractor/plumber, and is not responsible for any damages caused by the contractor/plumber. Contractor/Plumber work is warranted for 1 year following the installation of the water, reuse, and/or wastewater utility. SAWS will take over maintenance of the water, reuse, and/or wastewater utility on the first day following the contractor's/plumber's warranty expiration date.

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z       ALL

There are no records found that match your search criteria.