Aquifer Beaker

Edwards Aquifer

Aquifer Level 642.1'
5/22/13 - Official

The Edwards aquifer and its catchment area in the San Antonio region is about 8,000 square miles and includes all or part of 13 counties in south-central Texas.

Learn More »


Landscape Watering
Last Digit of Address Watering Day
0 or 1 Monday
2 or 3 Tuesday
4 or 5 Wednesday
6 or 7 Thursday
8 or 9 Friday
No Watering on Weekends

Stage 2:
wtr on ur day

Watering with an irrigation system or sprinkler is allowed only once a week from 7-11 a.m. and 7-11 p.m. on your designated watering day as determined by your address.

Learn More »


Close

Aquifer Level 642.1 | Stage 2: wtr on ur day

Login

Pay Your Bill Online

Username Password  
Forgot Your Password?  

New User

Register for SAWS eBill

Don't Have An Account? Get Started Now.

Sign Up Now


Close
Construction
Construction Project Status Hidden Springs Fire Flow Improvement
Construction Schedule: Mar 2012 - May 2013
Project Details
 
Project Number: 11-7003
Project Category: CIP
Project Type: Water Delivery

Project installs 870 linear feet of 16-inch water main along Aue Rd. from existing 16-inch main to proposed 12- inch main near the intersection on Aue Rd. and Whistling Wind.  (PZ11-17) $147,526.00Project installs 1,700 linear feet of 12-inch water main.  Along Aue Rd. from proposed 16-inch main to proposed Rocky Hill Booster Station.  (PZ11-18) $227,506.00Project installs 2,300 linear feet of 12-inch water main.From intersection of Aue Rd. and Whistling Wind along Whistling Wind, Black Creek and easement to proposed Rocky Hill Booster Station.  (PZ11-19) $307,802.00Project installs 1,200 linear feet of 8-inch water main.  From the intersection of Black Creek and Whistling Wind along Whistling Wind (PZ11-20) $107,062.00Project installs 930 linear feet of 12-inch water main.  Along Rocky Hill from the proposed Rocky Hill Booster Station to the intersection of Rocky Hill Rd. and Manor Hill Rd.  (PZ11U-01) $124,459.00Project installs 2,730 linear feet of 12-inch water main.Along Rocky Hill Rd and Manor Hill Rd. from the intersection of Rocky Hill Rd. and Manor Hill Rd. to the intersection of Manor Hill Rd. and Cedar Brush.  (PZ11U-02) $365,348.00Project installs 860 linear feet of 12-inch water main.Along Cedar Brush and an easement from the intersection of Manor Hill Rd. and Cedar Brush to the southern end of parcel 6606 Cedar Brush.  (PZ11U-03) $115,091.00Project installs 200 linear feet of 12-inch water main.  Through an easement from the southern end of parcel 6606 Cedar Brush to southern end of parcel 25 Crescent Ledge.  (PZ11U-04) $26,765.00Project installs a pressure reducing station.  Connects PZ 11U to PZ 11B via PRV valve.  Installs with project (PZ11U-04).  (PZ11U-05) $210,000.00Project installs a PZ 11U Booster Station near the intersection of Aue Rd. and Rocky Hill Rd. within the Hidden Springs Subdivision.  The station will consist of a 5,000 gallon hydro tank minimum, 1-50 gpm pump, 2-450 gpm pumps, 1-1,000 gpm pumps all producing a head of 226 feet.  (PZ11U-06) $1,003,625.00
Estimated Cost: $3,066,195

 


Questions about this project? Please contact:
Patrick O'Connor, P.E.
210-233-3020
Patrick.Oconnor@saws.org

Last Updated 10/27/11