All files are in Adobe PDF Format unless otherwise noted, and require the Adobe Acrobat Reader to be viewed. Use the link at the bottom of this page to get the Acrobat reader.
- TPDES Construction Site Inspector Training 8 MB – 45 pages
- Bexar County Storm Water Quality Site Development Permit 5 MB – 29 pages
- TCEQ Construction Storm Water – What To Expect During An Investigation 4 MB – 27 pages
- TCEQ Storm Water and Edwards Aquifer Protection Program Compliance Investigations 9 MB – 46 pages
- SAWS TPDES: Soil, Erosion and Sedimentation Methods 4 MB – 61 pages
- Ordinance 2014-06-19-0472 348 KB – 16 pages
- Delegation Letter 17 KB – 1 page
- Inspection Sheet 606 KB – 2 pages
Need the free Adobe® Reader® for PDF files? Click here.